My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10207
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:22 AM
Creation date
10/5/2006 4:58:34 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
503
County
Jefferson
Community
Unincorporated Jefferson County
Stream Name
Woman Creek, Walnut, Upper Big Dry and Rock Creek
Basin
South Platte
Title
Drainage & Flood Control Master Plan - Rocky Flats Plant
Date
4/1/1992
Designation Date
9/1/1999
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Subiect: <br /> <br />"Storm-Runoff Quantity For Various Design Events." ASI Task 6. January 8, <br />1991, <br /> <br />This hydrologic analysis of Woman Creek and Walnut Creek was prepared for EG&G <br />Facilities Engineering, Plant Civil/Structural Engineering in response to the Agreement in <br />Principle between the Colorado Department of Health and the U.S. Department of Energy. <br /> <br />This report presents the peak-flood flows and volumes for Woman Creek and Walnut Creek <br />at Indiana Street, downstream of Ponds A-4, B-5, and C-2, plus three selected upstream <br />locations. TR-20 analyses were done for 25-, 100-, 5OD-year, and PMP recurrence intervals <br />for durations of 2-, 24-, and 72-hours. The analyses were done with the terminal ponds (A- <br />4, B-5, and C-2) empty, !,-full, and full. <br /> <br />Assumntions <br /> <br />1. When there is more than 600 cfs flowing in Coal Creek, water spills into <br />ditches that contribute flows to Woman Creek and Walnut Creek. Coal Creek <br />spills up to 94 cfs into Upper Church Ditch and 170 cfs into McKay Ditch <br />which both contribute to North Walnut Creek. Coal Creek spills up to 1600 <br />cfs into Kinnear Ditch which contributes to Woman Creek. <br /> <br />2. PMF flows from west of the South Boulder Diversion Canal will breach the <br />berm of the canal and contribute 3,200 cfs to Woman Creek and 1,100 cfs to <br />North Walnut Creek. This assumption is based on a Woodward-Clyde study <br />in 1984. <br /> <br />Limitations <br /> <br />1. Subsequent analyses by private investigators and the USACE have shown that <br />assumptions on Coal Creek transfer of flood water to Rocky Flats are <br />incorrect. <br /> <br />Data Included <br /> <br />1. Estimated peak flows and runoff volumes for four locations on Woman Creek <br />are shown in Table 5 of the document. IOO-year, 2-hour peak flows at Indiana <br />Street ranged from 3,400 to 3,800 cfs, depending on initial Pond C-2 volume. <br /> <br />2. <br /> <br />Estimated peak flows and runoff volumes for six locations on Walnut Creek <br />are shown in Table 6 of the document. loo-year, 2-hour peak flow at Indiana <br />Street ranged from 2,300 to 3,600 cfs depending on the initial Pond A-4 and <br />B-5 volumes. <br /> <br />'> <br />J. <br /> <br />Design precipitation values for recurrence intervals of 2-, 5-, 10-, 25-, 50-, 100-, <br />and 500-years, and PMP, and durations of 5-, 10-, 15-, 30-minutes, and 1-,2-, <br />6-, 24-, and 72-hours are listed in Table 1 of the document. Sources of rainfall <br />data are documented. <br /> <br />4. <br /> <br />Design precipitation distributions for the recurrence intervals and durations <br />listed in item 3 are listed in Appendix B of the document. <br /> <br />5. <br /> <br />TR-20 input parameters of drainage area, time of concentration (Tc), and <br />curve number (CN) are listed in Table 3 of the document. CN was 85 for <br />undeveloped areas and ranged between 85 and 90 for developed areas. Basin <br />sizes ranged from 0.08 to 1.63 square miles. The corresponding Tcs ranged <br />from 0.22 to 1.65 hours. <br /> <br />6. <br /> <br />The report includes an extensive description of the Woman Creek and Walnut <br />Creek watersheds. <br /> <br />7. <br /> <br />The report provides analyses and data for the Woman Creek and Walnut <br />Creek basins which are useful for correlation with master planning studies and <br />preliminary design engineering for specific drainageways. II <br />
The URL can be used to link to this page
Your browser does not support the video tag.