Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />. <br /> <br />,; <br /> <br />Meetines and Coordination <br />At least two progress meetings shall be held between Contractor, the CWCB and the City of <br />Fort Collins during the course of the Project. The meetings will be held to discuss and review <br />work progress, to coordinate work efforts, and to provide input to the Contractor, Meetings <br />times will be mutually agreed upon at key project phases and scheduled accordingly, <br /> <br />The CWCB Project Manager, Mr, Brian Hyde, shall coordinate activities performed by the <br />Project participants. Any Project-related questions or problems shall be directed to Brian Hyde <br />at (303) 866-3441. The Contractor shall provide the name of one Derson who will serve as the <br />main point of contact for all communications between CWCB and Contractor, <br /> <br />Completion of Work <br />The contractor shall complete all work as assigned in this Scope of Work no later than January <br />19, 1998, Completion of the work will include the acceptable performance of tasks and the <br />delivery of ten (10) copies of the final report with included drawings, figures, and maps, Report <br />format shall be a comb-bound 8,5" by II" report with a color cover (cover to be approved by <br />CWCB), an index, an Executive Summary, the main body of the report text, and a map pocket at <br />the end of the report that contains large size maps, drawings, and/or preliminary design sheets. <br />Contractor shall also deliver two (2) sets of error free and virus free 3,5" high density floppy <br />disks containing digital files of the fmal report and other project related design files, Final report <br />shall be provided in Microsoft Word format (version 6,0 or later), <br /> <br />The contractor shall also submit two (2) copies of a Technical Addendum that shall include all <br />backup information, calculations, correspondence, and other pertinent information related to the <br />project. The Technical Addendum shall be a comb-bound 8,5" by II" report with a color cover <br />(cover to be approved by CWCB), and an index, <br /> <br />The Contractor shall return all government supplied information to the CWCB upon project <br />completion. <br /> <br />END OF SCOPE OF WORK <br /> <br />L:\wctrans\seca\brian\fcol floodproofing scope <br /> <br />7 <br />