Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-I <br />I <br />I <br />1 <br />, <br /> <br />GENERAL STATEMENT OF WORK <br /> <br />Location: Town of Columbine Valley (Vicinity of S0. Platte Canyon Road and Coal Mine Road). <br />Engineer: Love & Associates, Inc. <br /> <br />Estimated Construction Cost Range: Base Bid - $ 850,000 to $ 1,000,000. <br />Add Alternate Bid - $ 250,000 to $ 300,000 <br /> <br />WORK: <br /> <br />" <br /> <br />Base Bid: <br /> <br />Work includes: traffic regulation, clearing and grubbing, removal and replacement of topsoil, the <br />construction of approximately 2,962 l.f. of grass lined channel, boulder low flow channel, rock <br />walls, two golf tees, four golf cart crossing structures, utility relocation or protection measures <br />and golf course restoration including sod, landscaping, cart paths, and restoration of irrigation <br />systems. <br /> <br />Add Alternate Bid: <br /> <br />Work includes: traffic regulation, clearing and grubbing, removal and replacement of topsoil, the <br />construction of channel transitions, boulder low flow channel, rock walls, a triple 12' x 16' <br />reinforced concrete box culvert, utility relocation or protection measures, riprap, and golf course <br />restoration including sod, landscaping, and restoration of irrigation systems. <br /> <br />PROJECT SCHEDULE: <br /> <br />The Project is scheduled to start construction on October 1, 1996. Total Project time period is 150 <br />calendar days. Plantings should be completed between March 15 and April 15, 1997 <br /> <br />URBAN DRAINAGE AND FLOOD <br />CONTROL l;)ISTRICT <br />r1 ,I! ,'.) / <br />By: j, nu,/d//?';'?,J;1'/! <br />r:::. ..., I, j,. ,< ,/., <br />,~'D( , <br />Name: L. Scott Tucker <br /> <br />Title: Executive Director <br /> <br />Publication Dates: June 19,25, 1996 <br />July 1, 1996 <br /> <br />Published In: Daily Journal <br /> <br />00001-2 <br />