<br />GENERAL STATEMENT OF WORK
<br />
<br />Location: Town of Columbine Valley (Vicinity of S0. Platte Canyon Road and Coal Mine Road).
<br />Engineer: Love & Associates, Inc.
<br />
<br />Estimated Construction Cost Range: Base Bid - $ 850,000 to $ 1,000,000.
<br />Add Alternate Bid - $ 250,000 to $ 300,000
<br />
<br />WORK:
<br />
<br />"
<br />
<br />Base Bid:
<br />
<br />Work includes: traffic regulation, clearing and grubbing, removal and replacement of topsoil, the
<br />construction of approximately 2,962 l.f. of grass lined channel, boulder low flow channel, rock
<br />walls, two golf tees, four golf cart crossing structures, utility relocation or protection measures
<br />and golf course restoration including sod, landscaping, cart paths, and restoration of irrigation
<br />systems.
<br />
<br />Add Alternate Bid:
<br />
<br />Work includes: traffic regulation, clearing and grubbing, removal and replacement of topsoil, the
<br />construction of channel transitions, boulder low flow channel, rock walls, a triple 12' x 16'
<br />reinforced concrete box culvert, utility relocation or protection measures, riprap, and golf course
<br />restoration including sod, landscaping, and restoration of irrigation systems.
<br />
<br />PROJECT SCHEDULE:
<br />
<br />The Project is scheduled to start construction on October 1, 1996. Total Project time period is 150
<br />calendar days. Plantings should be completed between March 15 and April 15, 1997
<br />
<br />URBAN DRAINAGE AND FLOOD
<br />CONTROL l;)ISTRICT
<br />r1 ,I! ,'.) /
<br />By: j, nu,/d//?';'?,J;1'/!
<br />r:::. ..., I, j,. ,< ,/.,
<br />,~'D( ,
<br />Name: L. Scott Tucker
<br />
<br />Title: Executive Director
<br />
<br />Publication Dates: June 19,25, 1996
<br />July 1, 1996
<br />
<br />Published In: Daily Journal
<br />
<br />00001-2