My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09783
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:31 AM
Creation date
10/5/2006 4:38:19 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Stream Name
South Boulder Creek
Basin
South Platte
Title
South Boulder Creek/ Flatirons
Date
12/5/1997
Prepared For
Boulder
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~. <br /> <br />. <br /> <br />. <br /> <br />. Residents of the South Boulder Creek floodplain will have to be notified of the flood risks <br />prior to this years flood season. The public needs to be informed of the flood hazards. <br /> <br />. The flood warning plan for South Boulder Creek could be updated to include residents in the <br />unmapped portion of the floodplain. <br /> <br />. All entities at the meeting agreed to cooperate and participate in a master planning effort <br />which would address long-term mitigation strategies for South Boulder Creek. The Urban <br />Drainage and Flood Control District will need participants to agree on a scope-of-work, <br />funding shares, and schedule. It is possible to go directly into master planning and <br />implementation, and by-pass the map revision process in the immediate future. <br /> <br />. FEMA should not initiate a map revision of the South Boulder Creek floodplain until the <br />levee certification process is complete. If the levee certification is granted, the existing <br />floodplain mapping along the property, which already assumes a levee, will be fairly <br />accurate. If the levee certification is not granted, then the floodplain should be redefined to <br />reflect "without levee" conditions. In either case, the additional floodplain areas downstream <br />of the levee (i.e. Keewaydin subdivision) should be appropriately mapped, The mapping <br />update could either take place I) after the levee certification process and before the master <br />planning process, or 2) after the levee certification process and after the master <br />planning/implementation process. <br /> <br />These meeting minutes were prepared by Colorado Water Conservation Board staff, and reflect <br />pertinent discussion items during the meeting held on February 14, 1997. Please contact Larry <br />Lang or Tom Browning at (303) 866-3441 if you have any questions, comments, or concerns <br />regarding these meeting minutes. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.