Laserfiche WebLink
<br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Mr. Andy ~riscoe <br />3 September 1969 <br /> <br />Page 3 <br /> <br />lying west of 4th Stteet. The flood plain is shm-m on sheet 1. Follow- <br />ing construction of the proposed improvements, the flood plain I-Ii 11 be <br />confined to those areas included within the flood plain on sheet 2. <br /> <br />Uesign Criteria <br /> <br />Design Criteria for this Master Plan is based upon the ~rban Storm <br />Urainage Criteria Manual of the Denver f(e9ional Counci I of Governr.lents. <br />Some variation vidS made, hO\;Jever, to account for the need to carry sedi- <br />ment through the proposed channel because of the unique character of <br />this particular gulch. <br /> <br />Specific notes regarding design criteria and additional investi9ations <br />which should be made prior to design, are presented on sheet 2. It <br />should be noted that '-Jhere riprap is shmm, final design may properly <br />sho" rockfi lied gabions, grouted riprap or regular riprap, Furthermore, <br />whether or not gravel base for the riprap '-J; 11 be requi red, f'l"st be <br />determined from detai led field investigations. <br /> <br />It should also be noted that extensive use -has been made in tile rlaster <br />Plan of rai Iroad tie retaining "ails. Final design r.lay indicate other <br />types of aesthetic retaining lIall r,'aterial ,.till be Clore suitable. <br />Furthermore, use of railroad tie retai:ling '.;falls '.-lith aJequ..1te tie-backs <br />should receive additional design studies to insure its compatibility "Jith <br />the velocity of the flood flailS. <br /> <br />The channel betl-Ieen Canyon Street and Pearl Street is based upon steeply <br />sloping CO:lcrete '-I a 1 Is for both banks. This design concept is utilized- <br />extensively in the old historic cities of Europe successfully. ilo',lever, <br />there the concrete is faced \>Jj th rock to increa'le the rougl1nes~ and to <br />present an appearance corapatibJe ~.Jitrl the surrounding erlVirOfH!lent. <br /> <br />The Ilaster Plan <br /> <br />The f1aster Plan for Sunshine Gulch, as shOlm on Sheet L, is desiyned <br />to carry 1,000 cfs ~.Jithin the floodvJay. There i:, an arlific..ial flood <br />channel from the confluence with Boulder Creek to a point approximately <br />200 feet north of Spruce Street. Above this. the t1aster Plan consisb <br />of cleaning and clearing the channel along "ith mioor landscaping to keep <br />the flood ~Jaters from flo\-Jing a\oJay fror.] Sur.shine Gulch. bel'.,1een tile <br />Farmers Uitch and Pearl Street, the channel is designed to be compatible <br />with surrounding future uses. The Ctlannel bet\leen Fearl and Canyon, through <br />an industrial area, "Jill consist of a higher velocity channel. The channel <br />crOSS sections are viewed looking. downstrear:. <br />