My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09702
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09702
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:12 AM
Creation date
10/5/2006 4:34:10 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Broomfield, Westminster
Basin
South Platte
Title
Major Drainageway Planning
Date
11/1/1979
Prepared For
Broomfield, Westminster
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION I I <br />BASIN DESCRIPTION <br /> <br /> TABLE II-I <br /> GENERAL BASIN DATA <br /> DIRECT FLOW AREA 3207 <br /> Basin <br />Subbasin Area Percent Average Slope <br />Number (Acres) Impervious* (ft,/ft. ) <br />1 32 40 .019 <br />2 107 40 .032 <br />3 56 40 .026 <br />4 53 42 .028 <br />5 40 42 ,028 <br />6 41 60 ,031 <br />7 49 40 .035 <br />8 67 20 .021 <br />9 62 5 .044 <br />10 47 40 .013 <br />11 83 40 :.015 <br />12 22 45 .017 <br />13 64 20 .019 <br />14 52 40 ,012 <br />15 27 40 .029 <br />16 37 40 .030 <br />17 44 40 .014 <br />18 23 40 .011 <br />19 73 40 .008 <br />20 25 40 .011 <br />21 42 40 .019 <br />22 114 40 .020 <br />23 102 40 .020 <br />24 82 40 .017 <br />25 51 40 .026 <br />26 15 30 .009 <br />27 20 40 ,010 <br />28 71 40 .010 <br />29 57 40 .009 <br />41 72 40 .029 <br />42 29 5 .010 <br /> 1,659 <br />*Based on Future Developmett <br /> <br />The Direct Flow Area 3207 drainage basin is located within the cities of <br />Broomfield and Westminster in Township 1 South, Range 68 and 69 West of the <br />6th P,M, The basin has been divided into 31 subbasins and 7 channel reaches <br />for the purpose of this study, as shown on Figures II-I and 11-2. General <br />basin information is summarized in Table II-I. The basin is described in <br />detail on a reach basis below. <br /> <br />REACH I (Upper Limit of Study to Main Street) <br />The basin area tributary to Reach 1 is dominated by single-family residential <br />development, with the exception of the high school adjacent to Main Street <br />and south of Miramonte Boulevard. Development upstream from Miramonte Boule- <br />vard has been well pl anned wi th respect to drai nage and represents a fi ne <br />example of multipurpose use in the floodplain area, The subdivision open <br />space is located along the major drainageway and includes playgrounds and <br />bike paths. The cover illustration shows Miramonte Park, located just up- <br />stream of Daphne Street, There is no definite low flow channel in Reach 1, <br />except between Mi ramonte Boul evard and Mai n Street where the channel makes <br />two abrupt gO-degree bends. Major flows breach this channel and flow across <br />the high school baseball diamond. <br /> <br />The culverts at Daphne Street and Miramonte Boulevard allow 100-year flows to <br />overtop the roadway surface, however the depth of flow at both 1 ocati ons is <br />within the UD&FCD criteria for cross street flow, The existing 30-inch CMP <br />at Main Street is hydraulically inadequate for both the 2-year and 100-year <br />flows. <br /> <br />The Ridgeview Heights subdivision is currently under construction in the <br />undeveloped upper portion of Reach 1, and construction plans indicate that an <br />onsite detention facility has been designed to control excess runoff from the <br />single-family development. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.