Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE I-I <br />SUMMARY OF TOTAL COSTS <br />(Nov. 1979 Do 11 ars) <br />MAJOR DRAINAGEWAY PLAN <br />DIRECT FLOW AREA 3207 <br /> <br /> Channel & Street Util ity Property Total Annual <br /> Pl an & Profil e Detention Cross i ng Relocation Acquisition Improvement Maintenance <br /> Improvements Sheet Number Costs Costs Costs Costs Costs* Cost <br />Flow separation structure removal of existing small dam. 1 $25,445 -0- -0- -0- $25,445 $600 <br />New cu 1 vert and drop structure at Main Street. 2 -0- $191,625 $5,000 $2,100 $198,725 $340 <br />Modification of existing 100-year floodplain by private development. 3 -0- -0- -0- -0- -0- $650 <br />New culvert at East 10th Avenue. 4 -0- $168,715 $13,200 -0- $181,915 $750 <br />5-year detention facility. 5 $586,150 -0- -0- $225,000 $811,150 $3,600 <br />New culvert and drop structure at Sheridan Boulevard. 6 -0- $190,000 $2,000 $9,500 $201,500 $820 <br />Channel improvements at Mobile Home Park. 7 $148,650 -0- -0- $ 9,500 $158,150 $860 <br />New cu 1 vert and drop structure at Perry Street. 8 $ 45,700 $130,750 $4,000 $33,500 $213,950 $1,100 <br />New culvert and drop structure at Lowell Boulevard. 9 -0- $271,650 $2,ODO $24,800 $298,450 $2,100 <br /> TOTAL $805,945 $952,740 $26,200 $304,400 $2,089,285 $10,820 <br /> <br />* Includes costs for construction, engineering, contingencies, fiscal, legal, and <br />administrative expenses, See the estimated construction cost table for individual plan <br />and profile sheets for the breakdown of these costs. <br /> <br />3 <br />