Laserfiche WebLink
<br />ULowest Floor" means the lowest <br />oor of the lowest enclosed area (In- <br />ludlng basement). An unflnlshed or <br />000 resistant enclosure" usable solely <br />r parking of ,vehicles, building access <br />r storage In an area other than a <br />asement area Is not considered a <br />uildlng's lowest floor; Provided, that <br />ch enclosure Is not built so as to <br />nder the structure In violation of <br />e applicable non-elevation design re- <br />ulrements of f 60.30 <br />UMangrove stand/' means an assem- <br />lage of mangrove trees which are <br />ostly low trees noted for a copious <br />evelopment of interlacing adventl- <br />ous roots above the ground and <br />hich contain one or more of the fol~ <br />wing species: Black mangrove (Avl- <br />ennla Nltlda); ,red mangrove (Rhlzo- <br />hora Mangle); white mangrove (Lan- <br />cularla Racemosa); and button- <br />ood (Conocarpus Erecta)o <br />uManwactured home" means a <br />cture, transportable In one or <br />ore sections, which Is built on a per- <br />anent chassis and Is designed for use <br />th or without a permanent founda- <br />'on when attached to the required <br />itllitles. The term "manufactured <br />~ome" does not include a "recreation- <br />~ vehicle". <br />, "Manlifactured home park or subdi- <br />won" means a parcel (or contiguous <br />'arcels) of land divided Into two or <br />:lQre manufactured home lots for rent <br />,r sale. <br />"Map" means the Flood Hazard <br />loundary Map (FHBM) or the Flood <br />Murance Rate Map (FIRM) for a <br />ommunlty Issued by the Agencyo <br />uMean sea level" means, for pur- <br />oses of the National Flood Insurance <br />'rogram, the National Geodetic Vertl- <br />al Datum (NGVD) of 1929 or other <br />atum, to which base flood elevations <br />b.own on a community's Flood Insur- <br />nce Rate Map are referenced. <br />uMud8lideJJ (i.e., mucUZow) describes <br />condition where there Is a river, flow <br />r Inundation of liquid mud down a <br />llJside usually as a result of a dual <br />,ndltlon of loss of brush cover, and <br />Ile SUbsequent accumulation of water <br />n the ground preceded by a periOd of <br />nusually heavy or sustained rain. A <br />mdsUde (i.e., mudflow) may occur as <br />distinct phenomenon whlle a land- <br />ide Is In progress, and will be recog- <br /> <br /> <br />nized as such by the Administrator <br />only If the mudflow, and not the land- <br />sllde, Is the proximate cause of <br />damage that occurs. <br />"Mudslide (I.e., mu/U!ow) area man- <br />agement" means the operation of an <br />overall program of corrective and pre- <br />ventive measures for' reducing muds- <br />IIde (I.e.. mudflow) damage, including <br />but not limited to emergency pre- <br />paredness plans, mudsllde control <br />works, and flood plain ma.nagement <br />regulatlonso <br />uMudslide (i.e., mudflow) prone <br />area " means an areo. with land sur- <br />faces and slopes of unconsolidated ma- <br />terial where the history, geology and <br />climate indicate a potential for mud- <br />flowo <br />uNew construction" means, for the <br />purposes of determining Insurance <br />rates, structures for which the "start <br />of construction" commenced on or <br />after the effective date of an initial <br />FIRM or after December 31, 1974, <br />whichever Is later, and Includes any <br />subsequent improvements to such <br />structures. For floodplain manage- <br />ment purposes, "new construction" <br />means structures for which the "start <br />of construction" commenced on or <br />after the effective date of a floodplain <br />management regulation adopted by a <br />community and Includes any subse- <br />quent improvements to such struc- <br />tures. <br />lINew mantt/actured home park or <br />subdivision " means a manufactured <br />home park or subdivision for which <br />the construclton of facilities for servic- <br />Ing the lots on which the manufac- <br />tured homes are to be affixed (includ- <br />Ing at a minimum, the installation of <br />utilities, the construction of streets, <br />and either final site grading or the <br />pouring of concrete pads) Is completed <br />on or after the effective date of flood- <br />plain management regulations adopt- <br />ed by a communltyo <br />"lOO-year /lood"see f~aseflood." <br />"Participating community, " also <br />known as an l!eligible community," <br />means a community In which the Ad- <br />ministrator has authorized the sale of <br />flood Insuranceo <br />HPerson" includes 'any individual or <br />group of individuals, corporation, part- <br />nership, association, or any other <br /> <br />250 <br />