Laserfiche WebLink
<br />udflow) and/or flood-related erosion <br />LZlLrds in all official actions in the <br />eas having special flood, mudsllde <br />e., mudflow) and/or flood.related <br />osion hazards and to take such other <br />ficial action reasonably necessary to <br />rry out the objectives of the pro. <br />am; and <br />(9) A commitment to: <br />(i) Assist the Administrator at hls/ <br />,. request, in his/her delineation of <br />,e limits of the areas having special <br />,od, mudsllde (I.e.. mudflow) or <br />)od-related erosion hazards; <br />(Ii) Provide such information 'con. <br />rning present uses and occupancy Of <br />,e flood plain, mudsllde (I.e., mud. <br />)w) or flood-related erosion areas as <br />.e Administrator may -request: <br />(Iii) Maintain for pUblic inspection <br />Ld furnish upon request, for the de- <br />nninatlon of applicable flood Insur. <br />Lce risk premlwn rates within all <br />eas having special flood hazards <br />entlfied on a FHBM or FIRM, any <br />rtlflcates of floodproo!lng, and in. <br />nnation on the elevation (in relation <br />mean sea level) of the level of the <br />west floor (including basement) of <br />l new or substantially improved <br />ructures. and include whether or not <br />ch structures contain a basement, <br />Ld if the structure has been flood. <br />oofed, the elevation (in relation to <br />ean sea level) to which the structure <br />IS floodproofed; <br />Llv) Cooperate with Federal, State, <br />Ld iocal agencies and private firms <br />lich undertake to study, survey, <br />.p, and Identify flood plain, muds. <br />Ie O.e., mUdflow) or flood. related <br />osion areas, and cooperate with <br />Llghboring communities with respect <br />the management, of adjoining flood <br />ain, mudGlIde O.e., mudflow) and/or <br />)od-related erosion areas tn order to <br />'event aggravation of existing haz- <br />ds; <br />Lv) Upon occurrence, notify the Ad. <br />lnIstrator In writing whenever the <br />fundaries of the communit.y have <br />,en modified by annexation or the <br />mmunlty has otherwise assumed or <br />. longer has authority to adopt and <br />lforce flood plain management regu- <br />~ions for a particular area. In order <br />at all FHBM's and FIRM's accurate. <br />represent the community's bound <br />les, include within such notification <br /> <br />a copy of a map of the community <br />suitable for reproduction, clearly de. <br />lineating the new corporate limits or <br />new area for which the community <br />has asswned or relinquished flood <br />plain management regulatory author. <br />Ity. <br />(b) An appllca.nt sha.lIleglslatlvely: <br />(1) Appoint or designate the agency <br />or official with the responsibility, au. <br />thorlty, and means to Implement the <br />commitments made in paragraph (a) <br />of this section, and <br />(2) Designate the official responsible <br />to submit a report to the Admlnistra. <br />tor concerning the community partici- <br />pation In the Program, Including, but <br />not limited to the development and <br />implementation of flood plain manage- <br />ment regulations. This report shall be <br />submitted annually or biennially as <br />determined by the Administrator. <br />(c) The documents required by para. <br />graph (a) of this section and evidence <br />of the actions required by paragraph <br />(b) of this section shall be submitted <br />to the Federal Emergency Manage. <br />ment Agency, Washington DC 20472. <br /> <br />[41 FR 46968, Oct. 26, 1976, Rede:;ignated at <br />44 FR 31177, May 31, 1979 and amended at <br />48 FR 29318. June 24. 1983; 48 FR 44543 and <br />44552, Sept. 29, 1983: 49 FR 4751, Feb. 8. <br />1984: 49 FR 33656. Aug. 24, 1984: 50 FR <br />36023,Sept.4,1985] <br /> <br />ff 59.23 Priorities for the sale of flood in- <br />surance under the regular program. <br /> <br />Flood.prone, mudsllde (I.e., mud. <br />flow) and flood-l'elated erosion prone <br />communities are placed on a register <br />of areas eligible for ratemaking studies <br />and then selected from this register <br />for ratemaking studies on the basis of <br />the following conslrteratlons- <br />(a) Recommendations of State offi. <br />cials; <br />(b) Location of community and ur. <br />gency of need for flood insurance; <br />(c) PopUlation of community and in. <br />tensity of existing or proposed devel. <br />opment of the flood plain, the mud. <br />slide O.e., mudflow) and the flood.re. <br />lated erosion area; <br />(rt) Avallablllty of information on <br />the community with respect to Its <br />flood, mudsllde <I.e., mudflow) and <br />flood-related erosion characteristics <br />a~d previous losses; <br /> <br />256 <br />