My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09573
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:45 AM
Creation date
10/5/2006 4:28:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Stream Name
South Boulder Creek
Basin
South Platte
Title
South Boulder Creek/ Flatirons
Date
12/5/1997
Prepared For
Boulder
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />... <br />.. <br /> <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />SCOPE <br /> <br />UDFCD executed an agreement with Taggart Engineering Associates, Inc. (TEA) to <br />conduct an initial West Valley hydrology study of South Boulder Creek spills <br />downstream of Highway 36 to the area of the Wellman Ditch. <br /> <br />Specific tasks include: <br /> <br />. Request and review hydrologic modeling data by the Corps, <br />. Validate or modify the model with respect to the Viele Channel, Dry Creek <br />Ditch No, 2, and the West Valley Overflow. <br />. Conduct a field reconnaissance to identify hydraulic control structures and <br />conveyance characteristics along combined overflow and local drainage <br />routes. <br />. Prepare an initial hydrology model of the West Valley Overflow area from <br />Highway 36 to the Wellman Ditch and link this model to the Corps' model. <br />. Approximate hydraulics for flow splits and conveyances. <br />. Prepare a brief report with schematic maps describing the overall effort. <br /> <br />DATA OBTAINED AND REVIEWED <br /> <br />The data obtained for the Phase II effort included: <br /> <br />. Selected pages from Corps' reports on Boulder and South Boulder Creeks <br />hydrology. <br />. Corps' worksheets showing development of design rainfall hyetographs. <br />. Corps' SWMM sensitivity results for the Boulder Creek Study. <br />. Corps' parameter worksheets (area, lengths, and rainfall), <br />. SWMM executable file (the Corps' model used the EPA version of SWMM). <br />. As built information on some drainage structures, <br />. City electronic and hard copy topographic and features maps including the <br />entire tributary area (except Bear Canyon Creek) from the confluence with <br />Boulder Creek to the hog backs. <br /> <br />Studies and plans included: <br /> <br />. City of Boulder Storm Water Collection Svstem Master Plan, WRC, December <br />1984. <br />. City of Boulder Big Dry Creek Ditch II Preliminarv Desi9n Recort, MWE, <br />February 1996. <br />. 55th Street Improvements Baseline Road to Aracahoe Avenue Plans, Carter <br />Burgess, June 1996, <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.