Laserfiche WebLink
<br />The work was completed in February 1992. The hydrologic analyses were taken from <br />a Simons, Li & Associates, Inc" 1981 Master Drainageway Planning Study <br />(Reference 2). <br /> <br />1.3 Coordination <br /> <br />For the original Flood Insurance Study, community base map selection and the <br />identification of streams requiring detailed study were done at a meeting attended by <br />Gingery Associates, Inc.; the PIA; the Larimer County Planning Department; and <br />officials of the City on April 20, 1976. The USACE, Omaha District, was also contacted <br />during the course of the original study. <br /> <br />During the course of the work done by Gingery Associates, Inc., flood elevations and <br />boundaries and floodway delineations were reviewed with community officials. Revisions <br />to the original study, completed in 1973, incorporated new data prepared for the City by <br />the original study contractor. <br /> <br />The initial Consultation and Coordination Officer (CCO) meeting was held on July 25, <br />1988, and attended by representatives of the PIA; Gingery Associates, Inc.; and the City, <br /> <br />For the Cache La Poudre River restudy upstream of Horsetooth Road, coordination <br />meetings were held on November 26, 1991, and March 13 and April 28, ]992, wilh <br />representatives from Larimer County; the City of Fort Collins; Simons, Li & Associates, <br />Inc,; the Colorado Water Conservation Board (CWCB); and FEMA. <br /> <br />For the Cooper Slough LMMP project, the initial meeting was held on July 13, 1992, in <br />the City of Fort Collins' offices, Representatives of the City of Fort Collins; Larimer <br />County; the CWCB; FEMA; and Love & Associates, Inc" attended the meeting. At this <br />meeting, the hydrologic and hydraulic parameters for the LMMP project were established. <br />The base mylar work maps, hydrologic base mode], orthographic mapping, and <br />benchmark descriptions were provided by the City of Fort Collins and Larimer County <br />(References 3, 4, and 5), The final CCO meeting was held on October 26, ]993. <br /> <br />Coordination meetings for the Spring Creek LMMP project were held on February 27 and <br />May 19, 1993, and January 18, 1994, Representatives of the City; Foothills Engineering <br />Consultants, Inc.; Greenhorne & O'Mara, Inc.; and FEMA attended, <br /> <br />2.0 AREA STUDIED <br /> <br />2, I Scope of Study <br /> <br />This Flood Insurance Study covers the incorporated areas of the City of Fort Collins, <br />Larimer County, Colorado. <br /> <br />Floods caused by the overflow of Spring Creek, Cooper Slough, the Cache La Poudre <br />River, Dry Creek, and the Boxelder Creek Overflow Channel were studied in detail. <br /> <br />2 <br />