My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09514
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:29 AM
Creation date
10/5/2006 4:25:43 AM
Metadata
Fields
Template:
Floodplain Documents
County
Grand
Community
Ouray Ranch
Stream Name
Colorado River
Basin
Colorado Mainstem
Title
Ouray Ranch Project Phase II Preliminary Plat
Date
12/13/1984
Prepared For
Grand County
Prepared By
RME
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Jalles F. lJalsh <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />APPENDIX 'C' <br />C-2 <br /> <br />replace.ent area should be constructed by lo.ering the <br />overal I elevation to bring it lithin the required later <br />table for establ ish.ent of a let land ecotone. Folloling <br />excavation, this area should be seeded and revegetated. <br /> <br />C. Material excavated for the fi I I of the access roads <br />should be taken froa the let land replaceaent area. <br />Disturbed vegetation should be stockpiled for later <br />revegetation. Required voluae esti.ates for the access roads <br />indicates that a replaceaent ratio of 3 to i can be attained <br />by careful planning and and construction supervision. The <br />resulting benefits for increasing the ratio is tao fold: 1. <br />to lore than adequately co.ply lith al I revleling agencies <br />and 2. to enhance the privacy of each building site by <br />providing larger vegetation buffers. <br /> <br />Upon for.ulation of final develop.ent plans, the for.al <br />404 per.it process .i I I be initiated by this office. <br /> <br />Sincerely, <br /> <br />,> <br />C~-~/-"-/ ./ / <br />, ~ <br />/-.c,,,,.--e(y -:--r-. ;,;~~ <br /> <br />cc Ed Opitz, Rocky Mountain Engineers, Inc. <br /> <br />0"2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.