Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DECEMBER 13, 1984 <br /> <br />OURAY RANCH PROJECT <br />PHASE 2 <br /> <br />PRELIMINARY PLAT <br /> <br />TABLE OF CONTENTS <br /> <br />I. PROJECT DESCRIPTION <br /> <br />II. PROJECT FEATURES <br /> <br />A. TOPOGRAPHY <br />B. SOILS <br />C. 100YR FLOOD PLAIN <br />D. WETLANDS <br />E. WATER SUPPLY <br />F. SEWAGE TREATMENT <br />G. ACCESS <br />H. DRAINAGE <br />I. REVEGETATION <br />J. COLORADO RIVER WATER QUALITY CONTROL <br />K. PUBLIC IMPROVEMENTS ESTIMATE <br />L. OWNERSHIP AND OPERATION <br /> <br />APPENDIX <br /> <br />A. LETTER OF EVIDENCE <br />B. ROCKY MOUNTAIN ENGINEERS, INC. <br />FLOOD STUDY <br />C. STREAM TEAM WETLANDS RECOMMENDATIONS <br />D. COLORADO DISCHARGE PERMIT <br />E. DRAINAGE BASIN SKETCH <br />F. PUBLIC IMPROVEMENTS ESTIMATE <br /> <br />ATTACHMENTS <br /> <br />ROCKY MOUNTAIN ENGINEERS, INC. - DRAWINGS <br />- PHASE 2 PRELIMINARY PLAT DWG 8023-120 <br />- PHASE 2 WETLANDS MITIGATION PLAN -412 <br />- PHASE 2 ROAD PLAN & PROFILE -410 <br />- PHASE 2 SEWER PLAN & PROFILE -411 <br />OURAY RANCH WATER AUGMENTATION PLAN <br />(5 SETS TO PLANNING DEPARTMENT) <br />GROUND ENGINEERING CONSULTANTS, INC <br />SOILS REPORT <br />(5 SETS TO PLANNING DEPARTMENT) <br />