My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09513
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:29 AM
Creation date
10/5/2006 4:25:23 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Fountain River Survey Report
Date
1/1/1951
Prepared For
CWCB
Floodplain - Doc Type
Flood Documentation Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />,- 5 - <br /> <br />combinations thereof, which may involve construction of dams, re- <br /> <br />servoirs and other works for the purposes of water utilization and <br /> <br />control, as well as the improved or prolonged functioning of exist- <br /> <br />ing works: Provided, that the waters of the Arkansas River, ,as <br /> <br />. <br />defined in Article III, shall not be materially depleted in usable <br /> <br />quantity or availability for use to the water users in Colorado and <br />Kansas under this compact by such future development or construction." <br /> <br />Since the project being considered is in a tributary basin of the Ar- <br /> <br />kansas River in Colorado, a positive evaluation should be made in the project <br /> <br />report of the effects of the project measures upon the usable quantity or <br />availability for use of the, water supply which has histOrically been yielded <br /> <br />by the tributar,y. The comments of the Bureau of Reclamation, Corps of En- <br /> <br />gineers, Federal Power 'Commission and U. S. Geological Survey, as published in <br /> <br />the appendix to the Survey Report, all contain references to the possible ef- <br /> <br />fects of the proposed remedial measures on downstream water uses. However, no <br /> <br />estimate of stream depletion resulting from the proposed project installations <br /> <br />was made in the report, to furnish a suitable basis of comparison with the pre- <br />sent yield of the watershed available for water users in the' Fountain River <br /> <br />Basin or those downstream from its mouth. The only reference to the matter is <br />found on page 126 of the appendix, where it is stated: <br /> <br />"The relationship of the recommendations in this report to <br /> <br />the provisions of the Arkansas River Compact between the States <br /> <br />of Colorado and Kansas has also been considered and it appears <br /> <br />that the recommended program, when fully installed, would not <br /> <br />significantly affect the terms of that compact." <br />
The URL can be used to link to this page
Your browser does not support the video tag.