My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09513
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:29 AM
Creation date
10/5/2006 4:25:23 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Fountain River Survey Report
Date
1/1/1951
Prepared For
CWCB
Floodplain - Doc Type
Flood Documentation Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.;. ,,:i. <br /> <br />/ <br /> <br />OfF I C I A L COM MEN T S <br />-------. -------- <br /> <br />i <br />~, <br /> <br />of' the <br /> <br />STATE OF COLORADO <br /> <br />on the <br /> <br />SURvEy RE:PORT, FOUNTAiN RIVER <br />WA'rERSHED, COLORADO" 1951 <br /> <br />May' 15, 1952 <br /> <br />The Secretary of' Agriculture <br /> <br />Sirs <br /> <br />The Department of Agriculture has submitted to the Governor of Colorado for <br /> <br /> <br />information and State connnents on "Survey Report Fountain River Watershed, Colo- <br /> <br /> <br />rado", dated 1951. In accordance with estal)lished State procedure, this report <br /> <br /> <br />has been referred to the Colorado Water Conservation Board for review and sub- <br /> <br />mission of connnents thereon. <br /> <br />.( <br />The report has been carefully reviewed by the staff of the Colorado Water <br /> <br />" ~ <br />Conservatiop Board and considered at a regular meeting of the Board held on <br /> <br />" <br /> <br />" <br /> <br />MBlf 5, 1952. The Board has authorized its Director to submit the following <br /> <br />comments: <br /> <br />The progr8lll reconmended in the survey report contemplates in general the <br /> <br />adoption of meallures on cultivated, range and forest areas, in the Fountain <br /> <br />River watershed, designed to rllduce and retard surface runoff, stabilize the <br /> <br />soil mantle, and check accelerated erosion. The measures are interdependent, <br /> <br />and ,8~ expected to reduce flood and sediment damages. The estimated total cost <br />ciurina; the il)St.a11ation period is $3,762,000. Of this amount, it is reconnnended <br /> <br /> <br />, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.