Laserfiche WebLink
<br />~ <br />I l. <br />If' <br />II.'.....'. <br />, . <br /> <br />I,,' <br /> <br />i :' <br /> <br />I; <br /> <br />May 23, 1975 <br />Weld County Planning Director <br />Fil e No. P57-75 <br />Page 2 <br /> <br />COST SCHEDULE <br /> <br />~: . <br /> <br /> <br />I <br /> <br />,. <br />, <br /> <br />1. Flying and Photography <br />2. Ground Control Survey for Mapping <br />3. Topographic Mapping <br />With planimetric background <br />With orthophoto background <br />4. Dimension Culvert and Bridge Structures <br />15 @ $50.00 <br />5. . Field Survey of Cross Sections (Allowance 5) <br />Each Cross Section $100.00 <br />6. Digitized Cross Sections 100 @ $6.00 <br />7. Monuments 6 @ $50.00 <br /> <br />t <br />~, <br />l <br />I <br />f <br />! <br />! <br /> <br />TOTAL <br />TOTAL <br /> <br />Time of completion - 120 days <br /> <br />Respectfully submitted, <br />. HOGAN & OLHAUSEN~P' C. '.. <br />,//)) CO." <br />. X-_,,-- G \ .-" <br />V Rb~~f~t,ctfc;ga~-". . r~ <br /> <br />. F"/ <br />REH/pf <br /> <br />L <br />: <br /> <br />'. <br /> <br /> <br /> <br />$ 652.50 <br />2;200.00 <br /> <br />(1) 8,720.00 <br />(2) 8,240.00 <br /> <br />750.00 <br /> <br />500.00 <br />600.00 <br />300.00 <br /> <br />(1) $13,722.50 <br />(2) $13,242.50 <br />