Laserfiche WebLink
<br />L <br />, <br />~. <br />f <br />t <br />r <br /> <br />.' <br /> <br />. (',1 ~) . - <br />'j ..~ " <br />e, <br /> <br />AGREEMENT FOR FLOOD PLAIN MAPPING <br />SERVICES FOR WELD COUNTY, COLORADO <br /> <br />This. agreement made as of the 15th day of July, 1975, between Weld <br /> <br /> <br />County, Colorado, hereinafter called the COUNTY, and Hogan and Olhausen, <br /> <br /> <br />P.C., hereinafter called the ENGINEER, Witnesseth, That whereas the COUNTY <br /> <br />{ <br />, <br /> <br />I <br /> <br /> <br />~;: <br /> <br />has call ed for bids for engi neeri ng servi ces to prepare photogrammetri c <br />maps and valley cross sections of portions of the Big Thompson River as <br />outlined on the attach.ed map labeled exhibit "A" and according to the <br />specifications of the Colorado Water Conservation Board attached hereto <br />and labeled exhibit "B"" and Whereas the ENGINEER has prepared a letter <br />of proposal dated May 23,1975, attached hereto and labeled exhibit "C", <br /> <br />which describes alternate techniques and equipment and modifies certain. <br />sections of the specifications in exhibit IIB", <br /> <br />I <br /> <br />NOW, THEREFORE, the COUNTY and ENGINEER for the consideration <br /> <br /> <br />hereinafter set forth in schedule'''A'' agree as follows: <br /> <br /> <br />The ENGINEER will prepare the required maps in accordance with the <br /> <br /> <br />maps and specificat.ions described in exhibits IlAII, IlSII and Hei. with the <br /> <br />~.. <br /> <br />following schedule of costs. <br /> <br />SCHEDULE "A" COST SCHEDULE <br /> <br />1 - Flying and Photography <br /> <br />(The Engineer wi 11 provide three sets of <br />stereo contact prints to the County along <br />with their respective index map) <br /> <br />2 " Ground Control .,Survey for Mappi ng <br /> <br />3 - Topographic Mapping with Orthophoto Background <br /> <br />(The Engineer will provide two sets of finished <br />mylars and three sets of black and white <br />prints to the County along with their re- <br />spective index map) <br /> <br />4 - Dimension. Culvert and Bridge Structures <br /> <br />5 - Field Survey 5 Cross Sections <br /> <br />6 .Digitize lDO Cross Sections' <br /> <br />7 - Set 6 Permanent Monuments <br /> <br />$ 652.50 <br /> <br />I <br /> <br />i <br />~ <br /> <br />2,200.DO <br />8,240.DO <br /> <br />\- <br />i <br />, <br />, <br />f. <br />, <br /> <br />TOTAL <br /> <br />750.00 <br />500.00 <br />600.00 <br />300.00 <br />$13,242.50 <br /> <br />Time of completion 120 days. <br />In addition, the ENGINEER will retain a local person to contact <br />landowners and obtain permission to survey on behalf of the COUNTY. In <br /> <br />" <br />-, <br />