My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09447
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:17 AM
Creation date
10/5/2006 4:19:59 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Malta Montana
Basin
Statewide
Title
Reconnaissance Report Flood Control for Milk River at Malta Montana
Date
12/1/1991
Prepared For
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />I <br />I. <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />flood fighting operationa. The bottoll width 18 dependent on the 1_. <br />helght. One vertical on three hor1zontal dde .lop.. were us.d to awid <br />damage by WaVe action and to faciUtate ea.e of _ing. It wa. det.mned <br />that r1prap would not be nece..ary with any of the levee dedp. <br /> <br />Floodwalh were used in .ubarea. 1 and 2 wher. .dequat. right-of- <br />way wa. not available for the use of earth-ber.ed l.v.... The flooclvaU. <br />were used along the levee aUpenta where the location of hOlle. and IAOtal <br />building. prevent. adequate clearance for eartb-berMd leve... An itlVllr- <br />ted "T" floodwall was used in these area.. A typical .ection 18 .how on <br />plate 7. Flooclvall height. ranged frOll 6.5 to 7.5 feet. <br /> <br />Subarea 3 would require the conatruction of a ring levee to ade- <br />quately protect the hOlies in thi. area. A ring levee de.ign i. nece.sery <br />because high ground 18 not available in the 1DIIIed1ata vicinity to tie off <br />a single length of levee. The ring levee i. .hown a. alignment 4. <br /> <br />Aouurtenant Feature.. A provision for the rellOVal of .urface runoff <br />froll the .re.. protected by levee. would be ..de by inatalling drainaae <br />.tructure. through the levee. In general, the .trueture. would be c1e- <br />signed to adequately drain the area during low-flow perioda on the river. <br /> <br />The right-bank area that draina into the Kilk Il1ver conabt. of <br />332 acres of nearly level land. Most of thi. area i. in cOllllercial and <br />residential land use. Based on drainage patterns cletemined froll the <br />topographic upping of the area, there would be a need for two outlet. in <br />subarea 1 and three outlet. in subarea 2. <br /> <br />An interior drainage .tudy was conducted in 1967 for a levee project <br />extending along the right bank of the entire river reach through Male.. <br />It determined that five drainage structures would be necessary, rangiac <br />froll 24 to 48 inches in diameter. All were designed to ba reinforced <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.