Laserfiche WebLink
<br />TABLE 4 <br />Detailed Information Which Is Consistent With <br />Previouslv Prepared Detailed Information <br /> <br />Stream Reach Previous Designation <br />The Big Thompson River from the crossing a/County Road 9E upstream to FPR# 128 <br />a point approxiltU11ely 1340 feet downstream of the crossing of West 1st <br />Street <br />The Big Thompson River from a point approxiltU11ely 710 feet downstream FPR #128 <br />of the crossing of Wilson Avenue in the City of Loveland upstream to a point <br />approxiltU11e1y 1 mile upstream of the crossing of County Road I9E <br />Coal Creek from a point approxiltU11ely 1600 feet upstream of its confluence FPR # 227 <br />with Boxelder Creek upstream to the southern corporate limit of the Town of <br />Wellington <br />Coal Creekfrom the northern corporate limit of the Town ofWeUington at FPR # 227 <br />Colorado Highway 1 upstream approxiltU11ely 2000 feet <br /> <br />; and <br /> <br />WHEREAS, said new report for Larimer County, revised March 23, 1999, is consistent with <br />Resolution No. 94-350, and by reference with Resolution No. 96-431 and Resolution No. 99481, <br />regarding detailed floodplain information for Boxelder Creek within the unincorporated portions of <br />Larimer County adjacent to the Town of Wellington, but is inconsistent with and, therefore, supercedes <br />Resolutions Nos. 94-350, 9643 I and 99481 regarding the detailed floodplain information for Coal <br />Creek within the unincorporated portions of Larimer County adjacent to the Town of Wellington; and <br /> <br />WHEREAS, Resolution No. 99488 contains floodplain delineations for the Big Thompson <br />River within the City of Loveland, which delineations were designated and approved by the Colorado <br />Water Conservation Board as approximate floodplain information, and contains mapped flood <br />elevations and with the water surface profiles associated with those floodplain delineations, which <br />elevations and profiles were not designated and approved by the Colorado Water Conservation Board <br />due to technical errors with stream stationing, which floodplain delineations revised and, therefore, <br />supercedes the following detailed floodplain information, previously designated by the Colorado Water <br />Conservation Board, as listed in Table 5 below; <br /> <br />TABLES <br />Approximate Information Within the City of Loveland lFPR # 99-488) <br />Which Has Superceded Previouslv Prepared Detailed Information <br /> <br />StJ'eamReacli Previous Designation <br />The Big Thompson River from a point approximately 1340 feet downstream of the FPR # 128; FPR # 181 <br />crossing of West 1st Street upstream to from a point approximately 7/0 feet <br />downstream of the crossing of Wilson Avenue in the City of Loveland <br /> <br />6 <br />