Laserfiche WebLink
<br />Item No, 104 PROTECTION OF EXISTING STRUCTURES, No quantity measure- <br />ment WiTI be made for any materials or worK, required to complete this item in <br />place, The lump sum price bid for tll'is item shall include all of tile <br />Co~tractor's costs of whatsoever nature. The price bid will include: <br />sheeting; shoring and bracing; concrete footings; timbers; steel beams; <br />reconstructing existing foundation; excavat'ion; backfill; repair of any damage <br />resultin~J from construction; and all otller related and necessary materials, <br />work, and equipment required to provide te'llporary and/or permanent protection <br />fo~ existing structures. <br /> <br />Item No. 105 WATER CONTROL, The Vlol"k covered in this section consists <br />of controlling normal stream low flows and storm flows during construction. <br />The Contractor shall submit a plan for water control prior to c~nmencement of <br />construction, The plan shall include locations, heights, 3nd types of <br />construction for any flow re-routing schemes, The submittals shall include <br />Ivhere, when, and for how long pumping or fIG./ diversions are anticipated, <br /> <br />On-site materials may be used within the 1 imits of construction to construct <br />temporary berms, Other materials, SUCll as plastic sheeting or sand bags may <br />be used if desi red by the Contractor, <br /> <br />For all excavation, the Contractor shall provide suit"ble equiplnent and labor <br />to remove surface or groundwater, and shall keep the excavated arE,as dewatered <br />so that pipe, formi ng, riprap, and concrete work can be carri ed out under <br />dewatered conditions, <br /> <br />Temporary benns are permitted as an aid in controlling ,later. The design, <br />placement, safety, and maintenance of temporary berms is entirely the respon- <br />sibilityof the Contractor, All excavation made as part of the deVlatering <br />operations shall be backfilled with the same type materials as were removed, <br />and compacted to 95 percent of maximum density (AST~l D,-698 or D-,1557) , <br /> <br />The Contractor shall conduct his operations 'in such manner that storm flows <br />may proceed uni nterrupted along the; r street or drainage cou rses. Stonn fl ows <br />must not be dive:cted to areas outside thl! natural drainage path. By sub- <br />mitting a bid, the Contractor acknowledges that he has investigated the ris,k <br />arising from such waters and has prepared his bid accordingly, and assumes all <br />of said risk, Any damage done during storm flows to temporary or partially <br />compl eted structul"eS, or resulting from the Contractor's operati ons shall be <br />rep.,i red by the Contractor at hi s expense, <br /> <br />No measurement will be made for thi s work, but rather, the work will be con- <br />s i d'ered as a 1 ump sum iteln. <br /> <br />Item 106 REI10VE REINFORCED CONCRETE TRANSITION, The measurement for <br />payment of thi s item wi 11 be the total number of 11 near feet of rei nforced <br />con,:rete transition removed, as measured along the centerl ine. The price bid <br />per Ii near foot of reinforced concrete rellloval shelll include all of the <br />Contractor's costs of whatsoever nature required for the removal of the rein- <br />for':ed concrete transition structure, The unit price bid shelll include: <br />exc,vation, but not rock excavation; sheeting, shoring and bracing; concrete <br />s a\vi ng ex.i s ti ng concrete in a lOa nner sa tis f.3Ctory to the Enyi neer, remo vi ng <br />