Laserfiche WebLink
<br />CITY OF OURAY, C:)l.(JRADO <br />DEBRIS AND FLOOD CONTROL IMPROVEMENTS <br />PORTLAND CREEK PHI',SE I I <br /> <br />BID ITEM DESCRIPTIONS, MEASUREMENT AND PAYMENT <br /> <br />paynent shall be made only for those items included in the Proposal. A; 1 <br />costs incurred shall comply with the prov'isions of these Specifications and <br />shall be included in the unit price bid for the associated items in the <br />Proposal. Except as may be otherwise stipulated, no mater'ial, labor, or <br />equipment will be furnished by City. The basis of measurement ar.cl payment for <br />eac~ proposal i tef~ will be as described bel O'~: <br /> <br />Item No, 100 CLEARING AND GRUBBII~G. No quanitity measurement will be <br />made TOr any matenals or work requlred to complete this item "ir place. This <br />wor< shall consist of clearing, grubbing, relfoving, and disposinS of all vege- <br />tation and debris within the limits of the rigi1t-of-'tiay and permanent easement <br />a reas and such other areas as may be i ndi cated on the Dral,i ~gs or requi red by <br />the work, except such objects as are desi gnated to remain or' are to be <br />removed in accordance with other sections of these Specifications. This work <br />shall also include the preservation frOlo injury or defacement of all vegeta- <br />tion and objects designed to remain, <br /> <br />I tem No, 101 REI~OVAL OF EX ISTING COI~CR:TE FLUME. The measurement and <br />payment of this item will be the total numb'2r'-~)f linear feet of existing flume <br />,'equired to be removed for construction of ';Ile proposed flume measured along <br />the centerl i ne of the fl ume remove d. Th e un 'it pri ce bi d per 1 i nea r foot of <br />!'er.1Oval shall include all of the Contractor" s costs of whatsoever nature for <br />removing the existing flume, The price bid shall include: excavation; relllO- <br />val of surface materials; removing the existing flume; all required transpor- <br />tation of excavated materials; stockpiling the existing flume on site approved <br />by the City; prot':!ction of existing facilities; disposal of debris and excess <br />exc'lvated materia'l; and all other related and necessary materia'ls, work, and <br />equipment required to rehlove the existing flume in accordance with the <br />Oralvings and Specifications. <br /> <br />Item No, 102 and 103 REI1JVE, r~OOIFY AND REPLACE EXISTING 8RIDGES, The <br />mea5urement for payment of this item wiH--5e the total number of bridges <br />removed, modified and replaced, The unit price bid per bridge shall include <br />all of the Contractor's costs of whatsoever nature. The price bid shall <br />include: remova"1 of existing bridge structure; storage; mod';'ications as <br />shO\VI1 in tile drawings; construction of concret" bearing surfaces; any barrica- <br />des, traffic control, and detour signs necessary during construction; <br />rebuilding and compacting approach roadways; and all othel' related and <br />necessary materials, work, and e4uipment necessary to remove, modify and <br />replace the bridge, <br />