<br />1. Dt'nned Terms. <br />Terms used h these Instructions 10 Bidders which are defined <br />in the Standard General Conditions of the Construction.Con. <br />tract. NSPE,ACEC Document 1910-8, CSI 56465 (1978 edi- <br />tions) have tt.e meanings assigned to them in the General Con~ <br />ditions. The term "Successful Bidder" means the lowest, <br />qualified, responsible Bidder to whom Owner (on the basis of <br />Owner's evaluation as hereinafter provided) makes an award. <br /> <br />2. Copits 0 r Bidding Documents. <br /> <br />2.1. Complele sets of the Bidding Documents in the num. <br />bel' and for the deposit sum, if any, stated in the Advertise. <br />men! or Invitation may be obtained from Engineer (unless <br />another issdng office is designated in the Advertisement or <br />Invitation t'J Bid). <br /> <br />2.2. Complele sets of Bidding Documents shall be used in <br />preparing Bids; neither Owner nor Engineer assume any re. <br />sponsibility for errors or misinterpretations resulting from <br />the use of incomplete sets of Bidding Documents. <br /> <br />2.3. Owner and Engineer in making copies of Bidding <br />Documents available on the above' terms do so only for the <br />purpose of obtaining Bids on the Work and do not confer a <br />license or grant for any other use. <br /> <br />3. Qualifications of Bidders. <br /> <br />To demonstn.te qualifications to perform the Work, each <br />Bidder must be prepared to submit within five days of Own. <br />er's request written evidence.of the types set forth in the Sup- <br />plementary CJnditions, such as financial data. previous expe- <br />rience and evidence of authority to conduct business in the <br />jurisdiction where the Project is located. Each Bid must con- <br />tain evidence of Bidder's qualification to do business in the <br />state where t~.e Project is located 01' covenant to obtain such <br />qualification prior to award of the contract. <br /> <br />4. E:uminalion of Contract Documents and Site. <br /> <br />4.1. Before submitting a Bid, eal:h Bidder must (a) exam. <br />ine the Contract Documents thoroughly. (b) visit the site to <br />familiarize himself with local conditions that may in any <br />manner affect cost, progress or p(~rformance of the Work, <br />(c) familiarize himself with federal. state and local laws, <br />ordinances, rules and regulalions that may in any manner <br />affect cost. progress or performance of the Work; and (d) <br />study and carefully correlate Bidde'r's observations with the <br />Contract Do:uments. <br />4.2. Reference is made to the Supplementary Conditions <br />for the idenlification of those reports of investigations and <br />tests of subsurface and latent physical conditions at the site <br />or otherwise affecting cost, progress or performance of the <br />Work which have been relied upon by Engineer in preparing <br />the Drawings and Specifications. Owner will make copies of <br />such reports available to any Biddc~r requesting them. These <br />reports are not guaranteed as to accuracy or completeness, <br />nor are they part of the Contract Documents. Before sub~ <br />mitling his Bid each Bidder will, at his own expense. make <br />such additional investigations and tests as the Bidder may <br />deem necessary to determine his Bid for performance of the <br />Work in accordance with the time. price and other terms and <br />conditions 0: the Contract Documents. <br /> <br />4.3. On request Owner will provide each Bidder access to <br />the site to ,;onduct such investigations and tests as each Bid- <br />der deerr:s necessary for submission of his Bid. <br />4.4. The lands upon which the Work is 10 be performed. <br />rights..of-\'\>ay for access thereto and ot"1er lands designated <br />for use: by Contractor in performing the Work are identified <br />in the Supplementary Conditions. General Requirements or <br />Drawings. <br />4.5. The submission of a Bid will constitute an incontro~ <br />vertiblr. representation by the Bidder th<:lt he has complied <br />with every requirement of this Artkle 4 and thaI the <br />Contract Documents are sufficient in s<:ope and detail [0 <br />indical(~ ,and convey understanding of all terms and condi- <br />lions for performance of the Work. <br />5. IntE'l'pretations. <br />AU que,stions about the meaning or int'~nt of the Contract <br />Docum(~nts ~,hall be submitted to Engineer in writing. Replies <br />will be issued by Addenda mailed or detiv':red 10 all parties re- <br />corded by Engineer as having received the Bidding Docu- <br />ments. Ques~:ions received less than ten days prior to Ihe date <br />for opening of Bids will not be answered, Only questions an- <br />swered by formal written Addenda will be binding. Oral and <br />other interpretations or clarifications will be without legal <br />effect. <br /> <br />6 .-Bm-,",,,,,rtty, <br /> <br />6.1. Bid Security shall be made payabl,e to Owner, in a <br />amount of five percent of the Bidder's maximum Bid p e <br />and in the form of a certified or bank check or a Bi ond <br />(on form attached, if a form is prescribed) issued b); Surety <br />meeting the requirements of paragraph 5.1 of e General <br />Conditions. <br /> <br />6.2 The Bid Security of the SUl:cessful ldder will be re- <br />tained until such Bidder has execute ~Ie Agreement and <br />furnished the required Contract See lIy, whereupon it will <br />be returned; if the successful Bid r fails to e:l(ecute and de. <br />liver the Agreement anci Furni the reqL:ired Contract Secu- <br />rity wi! hin 15 days of the ice of Award. Owner mayan- <br />nul the Notice of Aware nd the Bid Security of that Bidder <br />will be forfeited. T Bid Security of ~InY Bidder whom <br />Owner be'!ieves to ve a reasonable chance of receiving the <br />award may be rained by Owner until the earlier of the sev. <br />enth day 1fl the "effeclive date of the >\greemenl" (which <br />term is d):Khed in the General Condition~,) by Owner to Con. <br />tracto ..-and the required Contract Security is furnished or <br />the x{y.first day after the Bid opening. Bid Security of <br />o er Bidders will be returned within seven day~ of the Bid <br />pening. <br /> <br />7. Contract Time. <br /> <br />Tht~ number of days within which, or the date by which. the <br />Work is to be completed (Ihe Contrac{ Time) is sel forth in the <br />Bid Form and will be induded in {he Agreement. <br /> <br />8. Liquidnu'd Dama~es. <br /> <br />Provisions for liquidated damages, if any, are set forth in the <br />Ag reemen l. <br /> <br />9. SubstitlJ11~ MaterlaJ arlld Equipment. <br /> <br />Th(~ Conlract, if awarded, will be on the basis of material and <br />equiprnenr. described in th<<: Drawings or Spt:cified in the Speci. <br />fications without consideration of possible' ~;ubslitute or "or- <br />equal" items. Whenever it is indicated .in the Drawings or <br />