My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09318
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:51 AM
Creation date
10/5/2006 4:11:52 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
1999 Flood Documentation Report (SOQ)
Date
6/14/1999
Prepared For
State of Colorado
Prepared By
Boyle Engineering Corporation
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5,000 feet of storm sewer, and the design of a l-mile reach of the Regional Channel. <br /> <br />. Project manager for the Golden Stonnwate.r Management Plan, City of Golden, <br />Colorado. This project included a review of the entire City drainage system in order to <br />identify drainage improvement requirements and prioritize specific flood control projects. <br />Hydrologic analyses, design of storm drainage systems and detention facilities, and cost- <br />benefit analyses were all conducted as part of this project. <br /> <br />. Project manager for the rehabilitation of Salt River Diversion structure (Etna Irrigation <br />District) near Jackson Hole, Wyoming; Hunt Canal Diversion structure near Lovell, <br />Wyoming; and Swon Canal Diversion Structure near Byron, Wyoming. These projects <br />included investigation of channel hydraulics, geomorphic evaluation of vertical and lateral <br />trends in the river and evaluation of long-term sediment transport and debris within the <br />river. Alternative diversion designs were prepared and included fish ladders and fish <br />screens. Efforts included investigation of long-term aggradation/degradation trends <br />involving sediment continuity principles. <br /> <br />. Project manager for the rehabilitation of hydraulic structures for the Goshen Irrigation <br />District near Torrington, Wyoming. This two-year project involves the analysis, <br />evaluation and design of improvements to a series of tunnels and inverted siphons through <br />a canal system with a maximum capacity of 1,500 cfs. The project also includes evaluation <br />and design of rehabilitation alternatives for a pump station along the Laramie River. <br />This task involved the hydraulic, geomorphic and sediment transport investigation of <br />the Laramie River along with evaluation and design of alternative pump stations (maximum <br />capacity 68 cfs). <br /> <br />· Project manager for the evaluation of the hydrology, hydraulics and geomorphic <br />investigation of Monroe Creek near Weiser, Idaho. The investigation was completed to <br />provide channel relocation options to the Idaho Transportation Department. It <br />included the hydrologic analysis of Monroe Creek, hydraulic analysis of the study reach <br />including bridge designs, and a sediment transport analysis of the existing and post <br />construction scenarios. <br /> <br />. Project engineer for the preparation of a design document and manual for river training <br />and bank stabilization works for the Department of Transport" Papua, New Guinea. The <br />project involved an intensive one-month field investigation of bed, bank and bridge <br />stability in rivers throughout Papua, New Guinea, development of design procedures and <br />mitigation measures for stabilizing the erosion problems, an And preparation of a manual <br />for selection and application of the appropriate stabilization measures. <br /> <br />· Principal engineer for the relocation and design of the LiUle Medicine Bow River in <br />Wyoming. The purpose of this project was to n:store the river to a stable configuration <br />following uranium mining and the design and construction of a bridge across the river. <br />Responsibilities included generation of hydrologic design discharges; development of <br />channel hydraulics to support floodplain, sedirru:nt transport, and bridge investigations; <br />geomorphic evaluation of the existing river channel, watershed, and bridge location; and <br />generation of design parameters for the proposed channel. Sediment rating curves and <br /> <br />T:\MARKET\Bios\BAA-BIO Drainage.wpd <br /> <br />ANdERSON CONsulriN<j EN<jiNEEnS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.