My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09318
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:51 AM
Creation date
10/5/2006 4:11:52 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
1999 Flood Documentation Report (SOQ)
Date
6/14/1999
Prepared For
State of Colorado
Prepared By
Boyle Engineering Corporation
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JI: PREVious ANd ON---CoiN(j WORk iN ThE <br />AffEcTEd AREAS <br /> <br /> <br />The ACE/Boyle Project Team has completed numerous projects within the counties and <br />communities that received a Presidential Disaster Declaration in 1999. Through the completion of these <br />projects, we have developed strong working relationships with county officials, engineers, and other <br />personnel. This experience has given us the background necessary to complete the CWCB project in an <br />efficient and cost effective manner. Our projects have made us familiar with the regions, river networks, <br />flooding issues, problem areas, conveyance elements, and most importantly, the agencies and staff with <br />which we will work in the completion of this project. <br /> <br />Both ACE and Boyle have long standing histories in the region. In fact, our combined years of <br />experience exceeds 31 years. Ifwe were to list all of the projects we have completed in the five counties, <br />the list would be voluminous. Therefore, on the following matrix, we have tabulated only those projects <br />we deemed to be relevant to the CWCB project. Furthermore, we have limited this list to those projects <br />completed within the last five years. <br /> <br />With this in mind, the following matrix displays the selected projects completed by the project <br />team in the five counties for which this information was requested (Table I). <br /> <br /> <br />-l <br /> <br />. <br /> <br />.., <br /> <br />~.~==-;:; <br /> <br />[I <br />',. ...... <br />;, .~,--~~ ' <br />~~.-~ <br /> <br /> <br />.. -.: ,., <br /> <br />July 28, 1997 Spring Creek Flood: Creekside Park <br /> <br />L <br />P <br /> <br />12 <br /> <br />ANdERSON CoN5UITiN<j EN<jiNEERS, INC. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.