Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3 <br /> <br />12. A grass-lined channel followed by a concrete-lined channel <br />with 100-year design capacity from the Marston Lake <br />caretaker's house access to old Wadsworth. <br /> <br />preliminary design such as jacking a 84-inch RCP under Colorado State <br />Highway 121 and providing a concrete box culvert bridge at Sheridan <br />Boul evard. <br /> <br />13. A convert with 5-year design capacity at old Wadsworth. <br /> <br />TABLE 1 <br /> <br />14. A concrete-lined channel with 100-year design capacity from <br />old Wadsworth to Colorado State Highway 121. <br /> <br />SUMMARY OF TOTAL COSTS <br /> <br />15. Addition of a pipe at Colorado State Highway 121 to pass 100- <br />year flood. <br /> <br />Plan and <br />Profil e <br />Sheet No. <br /> <br />Channel <br />Improvements <br />Costs <br /> <br />St reet <br />Crossing <br />Costs <br /> <br />Util ity <br />Relocation <br />Costs <br /> <br />Property <br />Acquisition <br />Costs <br /> <br />Total <br />Improvement <br />Cost <br /> <br />Annua 1 <br />Maintenance <br />Cost <br /> <br />16. A sediment settling pond capable of containing 2-year I-hour <br />storm runoff upstream of Colorado State Highway 121. <br /> <br />4 $ 68,900 $ 0 $ 0 $ 19,800 $ 88,700 $ 200 <br />5 308,300 0 0 105,000 413,300 1,200 <br />6 361,300 327,500 4,900 135,000 828,700 1,000 <br />7 620,500 0 0 63,000 683,500 1,200 <br />8 628,200 23,800 8,400 120,000 780,400 1,760 <br />9 383,500 0 0 21,000 404,500 600 <br />10 22,300 321,000 13,400 0 266,700 100 <br />11 230,600 6,600 0 45 ,000 282,200 500 <br />TOTAL $2,623,600 $588,900 $26,700 $508,800 $3,748,000 $ 6,500 <br /> Present Worth of Maintenance $95,700 <br /> <br />17. A grass-lined channel with 100-year design capacity from the <br />sediment settling pond to the east boundary of Park West 3 <br />subdivision. <br /> <br />The projected total cost of Master Plan Improvements is $3,748,000, <br />which includes costs for engineering, contingencies, land acquisition, <br />fiscal, legal and administrative expenses. The present worth of the <br />annualized operation and maintenance costs (50 year, 6-1~ percent) are <br />estimated at $95,700. A summary of these costs is given in Table 1. <br />A full breakdown of these costs is presented with each of the plan <br />and profile drawings at the end of this report. <br /> <br />The capital cost of these drainage and flood control improvements is <br />higher than that presented in the Phase A report because (1) the cost <br />in the Phase A report was based on 1978 unit cost and the cost in the <br />prel iminary design phase is based on 1979 unit cost, (2) this prel imi- <br />nary design has investigated all proposed facil ities in more detail, <br />(3) all grass-lined channels are designed with more width-to-depth <br />ratio for easy maintenance and therefore increase the rights-of-way <br />cost, (4) several facilities are added in this preliminary design such <br />as the concrete-lined channel through the Marston Sump, and a culvert <br />under old Wadsworth, (5) several facilities have been modified in this <br />