<br />~";" .
<br />"j ~
<br />1," ,.
<br />':, I
<br />Iii' I
<br />I"
<br />f1
<br />,1i~",:
<br />'ILl.
<br />li;)1
<br />i j
<br />r,:, t
<br />'I'
<br />II
<br />
<br />I. GWRAL TERMS AND CONDITIONS . '. ,I,
<br />,i'-':Y' I I
<br />: .' I ',:1 'I
<br />
<br />! . Buyet agr~es to give written notice of any shortage ordefect'li I,.!
<br />within.fifteen (15) days after the completion of the contract..
<br />No allowance will be made for labor, material) repairs 'or: al,
<br />terations without written consent. ' 'I; I . \;';; I !
<br />, :- .. , :; .,' ". ,~'. " : : .- r ( , ) I.: i
<br />'Buy~): ag:-ees to obtain and pay for all'permits, 'inspectionfJlesJ
<br />eng~neer~ng, staking and soil and compaction tests' as requirEl'd" I.
<br />unless spe'cifically stated otherwise. ' .1
<br />
<br />This agreement is subject to contingencies of manufacture,
<br />strikes, fires, embargoes, regulations by goverment, delays in
<br />transit due to breakdown, and to any other contingencies beyond
<br />our control.
<br />
<br />I"
<br />
<br />,
<br />"
<br />I,
<br />!
<br />
<br />L
<br />
<br />S.K.M. will not be responsible for relocatio~or alteration of
<br />existing utilities, damage to underground pipelines, wiring,
<br />etc. Should underground utilities, pipelines, wiring or other
<br />obstructions be encountered which were not shown on the plans
<br />or make known by the Buyer, prior to bidding, that result in
<br />additional cost for performance of the'work, it shall be c_n-
<br />sidered Extra Work. '
<br />
<br />In the event rock is encountered which cannot be separated and/
<br />or removed with a Case 580C backhoe and/or equal equipment,
<br />notice of s~ch condition will be given the owner. The separation
<br />and/or removal of rock shall be classified as Extra Work and
<br />shall be paid for in accordance with paragraph eight (8) below.
<br />
<br />,
<br />Whenever the bid for water and/or sewer lines, 'payment shall be'
<br />based on Unit Prices. On a unit price bid, quantities shown
<br />are approximate only. Payment shall be based on measurement of
<br />actual work performed at the unit prices herein specified.
<br />
<br />The prices herein specified include only the items listed. Any
<br />additional work or materials required to complete the contract
<br />or requested by the buyer, shall be considered Extra Work and
<br />shall be paid for at S.K.M. current equipment and labor rates.
<br />Outside p~rchasers and/or service shall be charged at cost plus
<br />twenty five per cent (25), and shall be subject to all terms
<br />or this contract.
<br />
<br />Any damages to the improvements constructed by us under this
<br />contract, which might result from wind, weather, operations of
<br />others, or other means beyond our control, will be repaired by
<br />others at no cost to us. Any repair work performed by us will
<br />be charged as Extra Work.
<br />
<br />At our option, this proposal shall become null and void if
<br />written acceptance and notice to proceed .is not received with~
<br />in thirty (30) days.
<br />
<br />;;,
<br />
<br />.i
<br />
|