Laserfiche WebLink
<br />~";" . <br />"j ~ <br />1," ,. <br />':, I <br />Iii' I <br />I" <br />f1 <br />,1i~",: <br />'ILl. <br />li;)1 <br />i j <br />r,:, t <br />'I' <br />II <br /> <br />I. GWRAL TERMS AND CONDITIONS . '. ,I, <br />,i'-':Y' I I <br />: .' I ',:1 'I <br /> <br />! . Buyet agr~es to give written notice of any shortage ordefect'li I,.! <br />within.fifteen (15) days after the completion of the contract.. <br />No allowance will be made for labor, material) repairs 'or: al, <br />terations without written consent. ' 'I; I . \;';; I ! <br />, :- .. , :; .,' ". ,~'. " : : .- r ( , ) I.: i <br />'Buy~): ag:-ees to obtain and pay for all'permits, 'inspectionfJlesJ <br />eng~neer~ng, staking and soil and compaction tests' as requirEl'd" I. <br />unless spe'cifically stated otherwise. ' .1 <br /> <br />This agreement is subject to contingencies of manufacture, <br />strikes, fires, embargoes, regulations by goverment, delays in <br />transit due to breakdown, and to any other contingencies beyond <br />our control. <br /> <br />I" <br /> <br />, <br />" <br />I, <br />! <br /> <br />L <br /> <br />S.K.M. will not be responsible for relocatio~or alteration of <br />existing utilities, damage to underground pipelines, wiring, <br />etc. Should underground utilities, pipelines, wiring or other <br />obstructions be encountered which were not shown on the plans <br />or make known by the Buyer, prior to bidding, that result in <br />additional cost for performance of the'work, it shall be c_n- <br />sidered Extra Work. ' <br /> <br />In the event rock is encountered which cannot be separated and/ <br />or removed with a Case 580C backhoe and/or equal equipment, <br />notice of s~ch condition will be given the owner. The separation <br />and/or removal of rock shall be classified as Extra Work and <br />shall be paid for in accordance with paragraph eight (8) below. <br /> <br />, <br />Whenever the bid for water and/or sewer lines, 'payment shall be' <br />based on Unit Prices. On a unit price bid, quantities shown <br />are approximate only. Payment shall be based on measurement of <br />actual work performed at the unit prices herein specified. <br /> <br />The prices herein specified include only the items listed. Any <br />additional work or materials required to complete the contract <br />or requested by the buyer, shall be considered Extra Work and <br />shall be paid for at S.K.M. current equipment and labor rates. <br />Outside p~rchasers and/or service shall be charged at cost plus <br />twenty five per cent (25), and shall be subject to all terms <br />or this contract. <br /> <br />Any damages to the improvements constructed by us under this <br />contract, which might result from wind, weather, operations of <br />others, or other means beyond our control, will be repaired by <br />others at no cost to us. Any repair work performed by us will <br />be charged as Extra Work. <br /> <br />At our option, this proposal shall become null and void if <br />written acceptance and notice to proceed .is not received with~ <br />in thirty (30) days. <br /> <br />;;, <br /> <br />.i <br />