My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09102
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:01 AM
Creation date
10/5/2006 4:04:55 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Patte
Title
Sterling Flood Control Interceptor Channel Project
Date
4/1/2002
Prepared For
Sterling
Prepared By
URS
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />IEmOITHREE AUected Environments and Environmental Consequences <br /> <br />Colorado Department of Public Health and the Environment <br /> <br />No additional coordination would be required with the Air Quality Division. <br /> <br />The Water Quality Division would require additional coordination by the contractor while <br />acquiring a NPDES Construction Stormwater Discharge Permit since more than 5 acres would <br />be disturbed. The agency also coordinates with the USACE regarding 401 Certification for the <br />USACE 404 Permit. <br /> <br />Colorado Department of Transportation <br /> <br />Based on information received from the applicant, it is our understanding that CDOT would <br />construct the new Highway 6 Bridge over the interceptor channel. The applicant would need to <br />coordinate with CDOT to assure their activities are scheduled to occur after the downstream <br />conveyance channel has been constructed. <br /> <br />Public Services and Utilities <br /> <br />The contractor is required by law to contact the Utility Notification Center for Colorado at 800- <br />922-1987 to obtain updated information regarding utilities present within the project area. The <br />contractor would need to coordination with local utilities to prevent unnecessary interruption of <br />service to residents of Logan County and Sterling during construction of the flood control <br />facilities. <br /> <br />Union Pacific Railroad <br /> <br />Based on information received from the applicant, it is our understanding that UPRR would <br />build a new bridge over the interceptor channel and construct temporary shoofly tracks to carry <br />rail traffic during the bridge construction. The applicant would need to coordinate with UPRR to <br />assure their activities are coordinated with the channel construction. <br /> <br />Logan County <br /> <br />For both Alternative 2 and Alternative 3, a Floodplain Development Permit would be required <br />from the Logan County NFIP Floodplain Administration. <br /> <br />3-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.