My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09063
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:07:51 AM
Creation date
10/5/2006 4:04:09 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Westminster
Stream Name
Big Dry Creek
Basin
South Platte
Title
CLOMR - Case 00-08-134R
Date
8/7/2000
Prepared For
Adams County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />2 <br /> <br />Our comparison of the proposed conditions model to the existing conditions model revealed that the BFEs <br />will decrease as a result of the proposed bridge waterway improvements, channelization, and low-flow <br />crossing structure. The maximum decrease in BFE, 4.6 feet, will occur approximately 140 feet upstream <br />ofI-25. <br /> <br />Our comparison of the proposed conditions model to the effective model revealed that the BFEs will increase <br />in some areas and decrease in other areas as a result of the proposed bridge waterway improvements, <br />channelization, and low-flow crossing structure and more detailed topographic information. The maximum <br />increase in BFE, 1.2 feet, will occur just upstream of Huron Street. The maximum decrease in BFE, 3.2 feet, <br />will occur approximately 140 feet upstream ofI-25. <br /> <br />Our comparison of the proposed conditions model to the effective model revealed that the widths of the <br />Special Flood Hazard Area (SFHA), the area that will be inundated by the base flood, and the regulatory <br />floodway will increase in some areas and decrease in other areas as a result of the proposed bridge waterway <br />improvements, channelization, and low-flow crossing structure and more detailed topographic information. <br /> <br />Upon completion of the project, your community may submit the data listed below and request that we make <br />a final determination on revising the effective FIRM and FIS report. <br /> <br />. Effective March I, 1999, FEMA revised the fee schedule for reviewing and processing requests for <br />conditional and final modifications to published flood information and maps. In accordance with <br />this schedule, the current fee for this map revision request is $3,400 and must be received before we <br />can begin processing the request. Please note, however, that the fee schedule is subject to change, <br />and you are required to snbmit the fee in effect at the time of the submittal. Payment of this fee shall <br />be made in the form of a check or money order, made payable in U.S. funds to the National Flood <br />Insurance Program, or by credit card. The payment must be forwarded to the following address: <br /> <br />Federal Emergency Management Agency <br />Fee-Collection System Administrator <br />P.O. Box3173 <br />Merrifield, VA 22116-3173 <br /> <br />. As-built plans, certified by a registered professional engineer, of all proposed project elements <br /> <br />. Community acknowledgment of the map revision request <br /> <br />. Certification that all fill placed in the currently effective base floodplain and below the <br />proposed BFE is compacted to 95 percent of the maximum density obtainable with the Standard <br />Proctor Test method issued by the American Society for Testing and Materials (ASTM Standard <br />D-698) or an acceptable equivalent method for all areas to be removed from the base floodplain <br /> <br />. A copy of the public notice distributed by your community stating its intent to revise the regulatory <br />floodway, or a statement by your community that it has notified all affected property owners and <br />affected adjacent jurisdictions <br /> <br />. A letter stating that your community will adopt and enforce the modified regulatory floodway <br />
The URL can be used to link to this page
Your browser does not support the video tag.