<br />ECON01HC Ai,ALYSIS
<br />
<br />Operations and maintenance costs are included to insure that
<br />facilities are maintained to function properly when flood events
<br />do occur.
<br />
<br />Introduction
<br />
<br /> TABLE XI
<br /> !
<br /> COST SUMMARY I
<br /> ,
<br /> ;
<br /> Alt. il Alt. #2 Alt. " Alt. " Alt. '5 ,
<br />Construction costs 2,268,000 2,672,000 6,427,000 891,000 1,950,000
<br />Contingency (20%) 454,001l 534,000 1,285,000 178,000 390,000
<br />Total Est Cost 2,722,000 3,206,000 7,712,000 1,069,000 2,340,000
<br />Engr (10%) 272,000 321,000 771,000 107,000 234,000
<br />ROW 1,266,000 2,101,000 2,473,000 706,000 1,241,000
<br />Subtotal li'roj Cost 4,260,000 5,628,000 10,956,000 1,882,000 3,815,000
<br />nA (12%) . 511,000 675,000 1,315,000 226,000 458,000
<br />Total Est Proj Cost 4,771,000 6,303,000 12,271,000 2,108,000 4,273,000
<br />o , M .. 143,000 189,000 368,000 63,000
<br /> 128,000
<br />Grand Total Cost 4,914,000 6,492,000 12,639,000 2,171,000 4,401,000
<br />
<br />A benefit:cost analysis waS completed for each of the select~d
<br />alternatives. This analysis considered both the benefit'cost ratios
<br />and the net benefits (benefits minus costs) of each improvement and
<br />other benefits that could not be quantified.
<br />
<br />This econo~ic analysis assumed a 50-year project life for drainage
<br />facilities. A financial lending r(lte of 6 - 7/8% was used, and benefits
<br />and damages were compared according to their present worth.
<br />
<br />The three stream reaches chosen for benefit, cost evaluations in this
<br />study were selected based upon the corporate boundaries between the
<br />City of Fort collins and Larimer County as described earlier (Sheet 1).
<br />As the study progressed, however, the improvements selected in Reaches
<br />A and B were found to be largely interdependent and should be considered
<br />as one improvement project. Therefore, the improvements and the costs
<br />of improvements for Reaches A and B were treated as one continuous
<br />reach--Reach A/B.
<br />
<br />.
<br />
<br />Fiscal, Legal and Administrative
<br />Operations and Maintenance
<br />
<br />The project benefits or the reduction in flood damages associated with
<br />each reach. could be readily identified and,_therefore, are presented
<br />separately for Roaches A and B. This information shows the benefits
<br />of an improvement project in Reaches A and B that can be reali~ed by
<br />the City of Fort Collins and those reali2;ed by Larimer COlmty. This
<br />information should be evaluated in the event that a joint funding
<br />project is considered.
<br />
<br />..
<br />
<br />The cost information presented in this report is based upon construction
<br />quantities estimated fro~ a preliminary design of facilities. This
<br />cost estimate should not be used to allocate funding for design and
<br />construction of tho~o facilities.
<br />
<br />Results
<br />
<br />The bcnefit:cost
<br />in Table XU.
<br />
<br />information determined through this study is preseutu<J
<br />
<br />-33-
<br />
<br />- 34-
<br />
|