<br />ECON01HC Ai,ALYSIS <br /> <br />Operations and maintenance costs are included to insure that <br />facilities are maintained to function properly when flood events <br />do occur. <br /> <br />Introduction <br /> <br /> TABLE XI <br /> ! <br /> COST SUMMARY I <br /> , <br /> ; <br /> Alt. il Alt. #2 Alt. " Alt. " Alt. '5 , <br />Construction costs 2,268,000 2,672,000 6,427,000 891,000 1,950,000 <br />Contingency (20%) 454,001l 534,000 1,285,000 178,000 390,000 <br />Total Est Cost 2,722,000 3,206,000 7,712,000 1,069,000 2,340,000 <br />Engr (10%) 272,000 321,000 771,000 107,000 234,000 <br />ROW 1,266,000 2,101,000 2,473,000 706,000 1,241,000 <br />Subtotal li'roj Cost 4,260,000 5,628,000 10,956,000 1,882,000 3,815,000 <br />nA (12%) . 511,000 675,000 1,315,000 226,000 458,000 <br />Total Est Proj Cost 4,771,000 6,303,000 12,271,000 2,108,000 4,273,000 <br />o , M .. 143,000 189,000 368,000 63,000 <br /> 128,000 <br />Grand Total Cost 4,914,000 6,492,000 12,639,000 2,171,000 4,401,000 <br /> <br />A benefit:cost analysis waS completed for each of the select~d <br />alternatives. This analysis considered both the benefit'cost ratios <br />and the net benefits (benefits minus costs) of each improvement and <br />other benefits that could not be quantified. <br /> <br />This econo~ic analysis assumed a 50-year project life for drainage <br />facilities. A financial lending r(lte of 6 - 7/8% was used, and benefits <br />and damages were compared according to their present worth. <br /> <br />The three stream reaches chosen for benefit, cost evaluations in this <br />study were selected based upon the corporate boundaries between the <br />City of Fort collins and Larimer County as described earlier (Sheet 1). <br />As the study progressed, however, the improvements selected in Reaches <br />A and B were found to be largely interdependent and should be considered <br />as one improvement project. Therefore, the improvements and the costs <br />of improvements for Reaches A and B were treated as one continuous <br />reach--Reach A/B. <br /> <br />. <br /> <br />Fiscal, Legal and Administrative <br />Operations and Maintenance <br /> <br />The project benefits or the reduction in flood damages associated with <br />each reach. could be readily identified and,_therefore, are presented <br />separately for Roaches A and B. This information shows the benefits <br />of an improvement project in Reaches A and B that can be reali~ed by <br />the City of Fort Collins and those reali2;ed by Larimer COlmty. This <br />information should be evaluated in the event that a joint funding <br />project is considered. <br /> <br />.. <br /> <br />The cost information presented in this report is based upon construction <br />quantities estimated fro~ a preliminary design of facilities. This <br />cost estimate should not be used to allocate funding for design and <br />construction of tho~o facilities. <br /> <br />Results <br /> <br />The bcnefit:cost <br />in Table XU. <br /> <br />information determined through this study is preseutu<J <br /> <br />-33- <br /> <br />- 34- <br />