My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08859
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:06:44 AM
Creation date
10/5/2006 3:56:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Clear Creek
Community
Georgetown
Basin
South Platte
Title
Flood Control Master Plan and Local Pre-Disaster Flood Mitigation Plan
Date
7/1/1998
Prepared For
Georgetown
Prepared By
Clear Creek County Office of Emergency Management
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Schedule and Budget <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />SECTION 5 <br /> <br />Schedule <br /> <br />A grant from the State of Colorado has been made <br />available to Clear Creek County and the Town of <br />Georgetown to assist in the development of a Flood <br />Hazard Mitigation Plan (FHMP). The deadline for <br />completing work under the grant is September 30, <br />1998 and requires that a community approved <br />FHMP be submitted to the State by that date. <br />Information to be included in the FHMP requires <br />that a Flood Control Master Plan be prepared <br />beforehand. Given the amount of work to be <br />completed, meeting the September 30 deadline will <br />require an ambitious schedule. A list of project <br />milestones for completing this work in the required <br />time frame is presented below. <br /> <br />August 3 . Kickoff/Brainstorm Meeting with <br />Georgetown and Clear Creek County <br />Some portions of the FHMP will necessarily be the <br />responsibility of the Town of Georgetown and/or <br />Clear Creek County. The kickoff meeting will serve <br />to allocate responsibilities to the various parties and <br />discuss deadlines. Additionally, a brainstorming <br />session will be held to discuss the pros and cons of <br />flood mitigation concepts presented in this proposal <br />and to generate additional ideas. <br /> <br />August 18 . Meeting with CWCB and FEMA <br />On August 18, 1998 Mark Matulik of the Colorado <br />Water Conservation Board (CWCB) and a <br />representative of FEMA will meet with officials of <br />Georgetown, Clear Creek County and the selected <br />consultant to discuss progress and deadlines for the <br />FHMP. Material presenting flood hazard mitigation <br />alternatives will be prepared in time for that meeting <br />so that input from FEMA and the CWCB may be <br />obtained. Town and County comments on proposed <br />alternatives will also be solicited at that time. <br /> <br />September 1 . Draft Flood Control Master Plan <br />Completed <br />Results of the Flood Control Master Plan will be <br />required input to the FHMP. Based on input and <br />comments on proposed alternatives from agencies, <br />the Town of Georgetown and Clear Creek County, <br />a draft Flood Control Master Plan should be <br />completed by September 1 to permit time for <br />preparation of the FHMP and incorporation of the <br />results of the Master Plan. <br /> <br />September 15 . Draft FHMP Completed <br />The deadline for submission of a community <br />approved FHMP to the State is September 30. In <br />order to provide time for community review, <br /> <br />((II) MONTGOMERY WATSON . 5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.