My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08833
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:06:37 AM
Creation date
10/5/2006 3:54:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Near Trinidad
Stream Name
Purgatoire
Basin
Arkansas
Title
Flood Control Problem Purgatoire near Trinidad
Date
1/1/1944
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />LETTER OF TRANSMITTAL <br /> <br /> <br />WAR DEPARTMEN'r, <br />Washington, January 24-, 194-4-. <br />The SPEAK>JR, HousE OJ)' REPRESEN'PATIVES. <br />DEAR MR. SPEAKER: I am transmitting herewith a report dated <br />September 8, 1943, from the Ohief of Engineers, United States Army, <br />together with accompanying parers and illustrations, on a, prelimi- <br />nary examination and survey 0 Purgatoire (Picket Wire) River, inc <br />eluding. Long Oanyon, 0010. This report was authorized by the <br />Flood Oontrol Acts approved on June 22, 1936, and June 28, 1938. <br />'rhe Under Secretary of War advises that theproject, if aut,horized, <br />would require approximately 2,400 tons of steel, a substantial amount <br />of constl'uction equipment and manpower, without being essential to, <br />or of u.ny presehtly indicated value to the war effort. There is no <br />objectiou to the submission of this report, but this Department does <br />not approve of the submission of any estimate of appropriation or <br />the initiation of auy construction on this project until after the war. <br />1'he Bul'eau of the Budget has been eonsuHed and advises that <br />while there would be no objection to the submission of this proposed <br />I'eport to the Oongress, in the absence of evidence showing that the <br />proposed works are necessary to the prosecution of the war, the sub- <br />mission during the presont emergency of any estimate of appropriac <br />tion for the construction of the project would not be in aCMrd with <br />the program of the President. <br />Respectfully, ' <br /> <br />HENRY L. STIMSON, <br />Secretary oj War, <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.