My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08833
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:06:37 AM
Creation date
10/5/2006 3:54:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Near Trinidad
Stream Name
Purgatoire
Basin
Arkansas
Title
Flood Control Problem Purgatoire near Trinidad
Date
1/1/1944
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Report of the District Engineer-Continued. <br />. Plan of improvement recommended_____~___,_____________________ <br />Estimate of first costs and annual oharges_ _ _ __..:.____________,______ <br />Estimated average annual bene~ts-generaL- _ ______H_____________ <br />Average annual benefits. Trinidad_ ~ _____ _________ _______________ <br />A verago annual benefits-agricultural-crops, lands and improvementa_ <br />.' Average annual benefits-transportation facilities, agricultural area__ <br />Average annual benefits-irrigation struotures_____________~,...----- <br />Irrigation be~efits-flood detention_ _ _ __:. _ _ _ ___ _ _ _ _".. _ _ _ _ __ __ __ _ ~_ <br />Irrigation benefits-less than bal~kfun stages___,-'~--------------___ <br />Benefits-enhancement of values__ _ ___ _ _ _ __ __ __ __ __ ____ __ _ _~ _ ___ <br />Summary of average annual benefits_________________.____________ <br />Project justification___ _ _ _ _ _ __ _ _ _ __ __ _ _ __ __ _ _ _ _ _ _ _ _ __ __ _ _ _ _ _ ____ <br />Flood channel delineation"'____ _ _ _ _ _____ __ __ __ __ _ _ _ _ _ ~ __ _ _ __ _ _ ___ <br /> <br />.. g~cl~~\~~;S~='= = = = = = = = = = = = = = = = = = = = = =' = = = = = = = = ='= =:= = = :': = = = =: = = = =:: <br /> <br />Iteeotn~cnaation________________________________~___~________. <br />Recommendation of the Division Engine!lr____~__________:-------.-.------ <br /> <br />LI8'l' OF TABJ.ES MADE IN CONNECTION Wn'I(R.EPORT OF THE DISTRICT ENGINEER <br /> <br />Table;No. <br />1. Tributaries of Purgatoit'C River_~__.:.h__.:._____~_____________~__.:. <br />2. Purgatoire Rivet, river slopes and minimum channel 'ca.paoities_h_~ <br />3. A vel'age monthly and annual temperatures and maximum and mini.. <br />mum recoI;ded temperatures___________ __ _hW___ _________~___~ <br />4. Uni~ed. Stn.~s Geologiesl Survey quadrangles covering Purgatoire <br /> <br />EUverBasln__________._____________________________________ <br />5. Trend of ~opulation in Purgatoire River Ba8in________________~___ <br />6. Population of principal communities in the Purgatoire Watershednw <br />7. Area overflowed (acres)_________________,--------~--.:-------~--_ <br />8. Pcrtintmf, data on the five rescnroir plans suggested by local interests_ ~ <br />9. Engineering features .of recommended channel impro.vement,at Trini- <br />dad,' Colo_ _ _ __ -:':-_ -- - -.- -,.,.,-~ - -'" -- - - - --,- - - -- -- - -- -,- ___ - _ - ___ <br />10. Estimated firSt. costs"and' anilual' clutl'ges for recommen'ded plan 'Of <br />imb~~~~~~~:_~~~~~~~~~~______~_~__________________________ 28 <br />Annual chal'ges_ __ ___________________ -___ ___ -_____________ 28 <br />11. Summary ~f average annual benefits, Purgatoire River flood plain_ ~ 31 <br />LIST OF ApPJlINDIXES MAPE IN CONNECTION WITH ,REPOR1' OF l'HE DJSTRICT <br />ENGINEER <br /> <br />(Only map' No,. l' and 9 of appendix A are printed.) <br /> <br />Appendix <br />A. Ma~'a~~~har.~: . <br />L 'Water,hed ma~.< <br />2. Valley details ,heet No.1). <br />3. Valley details sheet ,No.2). <br />4. V sUey det.u.ils sheet No.8). <br />5. Valley details lsheet No.4). <br />6. Valley details sllcet No.5). <br />7. Va.lley details sheet No.6). <br />8. Stream profile (sJleot No.1). <br />9. Recommended pIau of improvement (general pIau). <br />10. Recommended plan of improvement (plan and sections). <br />11. Recommended plan of improvement (profiles). <br />12. Recommended plan of improvement (structural details). <br />Chart No. <br />1. Economic limits of improvement (city of T'l:illidad). <br />B. Hydrology. <br />C. Economio data. <br />D. Pls.ns' 61 iiilpl'ovement, not recolllmended. . <br />E.. Resolu.tion of the city council, city of Trinidad, Cola., adopted March 8, 1943. <br /> <br />Pa~e <br />26 <br />27 <br />29 <br />29 <br />30 <br />30 <br />30 <br />30 <br />30 <br />30 <br />ill <br />32 <br />33 <br />33 <br />36 <br />36 <br />37 <br /> <br /> <br />Psg. <br />6 <br />8 <br /> <br />9 <br /> <br />10 <br />10 <br />11 <br />17 <br />23 <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.