Laserfiche WebLink
<br />" . <br /> <br />( , <br /> <br />SWDP 1150-2-1 <br />26 Kay 78 <br /> <br />d. In addition to other requirements set forth in this pamphlet, <br />permits may be required under Sections 10 and 404 for work within the <br />noodway.. These permits require a minimum of 90 days to process. The <br />Operations Division in the appropriate Corps of Engineers district <br />should be asked to make determinations on the need for these permits in <br />the early planning stages to prevent delays. <br /> <br />4. CRITERIA FOR PRESSUIU: PIPELINE CROSSING ExISTING LEVEES. <br /> <br />a. No excavation will be performed on the levee. Place the pipe- <br />line on the levee slopes and provide a minimum of 2 feet of cover. <br />Place the fill uniformly on the slopes and top of the levee to slope <br />aw~y from the pipe and parallel to the longitudinal axis of the levee. <br />The slope of the fill shall be between 1 on 10 and 1 on 15. RelllOve all <br />existing vegetation before fill is placed. <br /> <br />b. Where the pipeline crosses a discharge channel, place the pipe- <br />line on piers (the piers must not obstruct flow in the channel) or place <br />it under the discharge channel and encase it with concrete. Extend the <br />encasement a minimum of 5 feet into the channel side slopes. <br /> <br />c. Any maintenance and operation roads disturbed during construc- <- <br />tion will be repaired or replaced to a condition equal to or better than <br />their condition before construction. <br /> <br />d. All valves located within 15 feet either side of the toe of the <br />levee shall be in a concrete box enclosure with a manhole-type cover. <br />If the valve is placed in the top of the levee, the bottom of the excavation <br />shall not be lower than 1 foot above the design water surface elevation, <br />Place fill to uniformly slope away from the top of the valve box. <br /> <br />e. <br />within <br />Fasten <br /> <br />Provide watertight sealed manhole covers for all manholes <br />the floodway having tops below design water surface elevation. <br />manhole covers to the manhole structures. <br /> <br />f. Where a pipeline parallels the levee on the channel side of the <br />levee, the excavation will be a minimum distance of 15 feet from the toe <br />of the levee. Where the pipeline parallels the channel, the excavation <br />will be a minimum distance of 15 feet from the top of the channel bank. <br /> <br />8, Where the pipeline is on the landside of and running parallel to <br />the levee, the pipeline shall be a minimum distance of 15 feet from the <br />toe of the levee. Retain existing sumps, ditches, and swales, Finish <br />grading and returfing are required. <br /> <br />2 <br /> <br />'-. <br />