Laserfiche WebLink
<br />3-06 Report9. It shall be the duty of the superintendent to submit a semi- <br />annual report to the District Engineer covering inspection, maintenance and <br />operation of the project structures. The report shall be submitted in April <br />and October. A suggested checklist for use in supplementing the report is <br />included in Appendix B. <br /> <br />3-07 Inspection by Corps of Engineers. The District Engineer or his <br />authorized representative shall have access at all times to all portions <br />of the project structures. The project structures shall be inspected <br />periodically by the District Engineer or his representative to determine <br />the condition thereof and to ascertain the adequacy of operation and main- <br />tenance. Corrective measures or repairs which are deemed neces9ary shall <br />be promptly accomplished. <br /> <br />3-08 Local Cooperation Requirements. The specific local cooperation require- <br />ments for the Granada Flood Control Project are contained in the Agreement <br />Between the United States of America and the Town of Granada, Colorado, for <br />Local Cooperation with the United States of America in the Granada, Colorado, <br />Flood Control Project, executed on 22 November 1976, and First Amendment <br />thereto dated 8 January 1979. <br /> <br />~- <br />