My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08723
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:23 PM
Creation date
10/5/2006 3:49:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Stream Name
Cache La Poudre
Basin
South Platte
Title
Specifications and Contract Documents for Reservoir Number 2 Rehabilitation Project
Date
7/1/1990
Prepared For
Larimer
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />from ENGINEER; however, CONTRACTOR shall not be <br />liable to OWNER or ENGINEER for failure to report any <br />conflict, error or discrepancy in the Contract Documents <br />unless CONTRACTOR had actual knowledge thereof or should <br />reasonably have known thereof. <br /> <br />I <br /> <br />I <br /> <br />Amending and Supplementing Contract Documents: <br /> <br />3.4. The Contract Documents may be amended to pro- <br />vide for additions. deletions and revisions in the Work or to <br />modify the terms and conditions thereof in one or more of <br />the following ways: <br /> <br />I <br /> <br />I <br /> <br />3A.I. a form<l1 WriH~n Amendment. <br /> <br />3.4.2. a Change Order (pursuant to paragraph 10.4). <br /> <br />or <br /> <br />1 <br /> <br />3.4.3. a Work Directive Change (pursuant to para- <br />graph 10.1). <br /> <br />I <br /> <br />As indicated in paragraphs 11.2 and 12.1, Contract Price and <br />Contract Time may only be changed by a Change Order or a <br />Writlen Amendment. <br /> <br />I <br /> <br />3.5. In addition. the requirements of the Contract Doeu. <br />ments may be supplemented. and minor variations and devia- <br />tions in the Work may be authorized, in one or more of the <br />following ways: <br /> <br />I <br /> <br />3.5.1. a Field Order (pursuant to paragraph 9.5). <br /> <br />I <br /> <br />3.5.2. ENGINEER's approval of a Shop Drawing or <br />sample (pursuam to paragraphs 6.26 and 6.27), or <br /> <br />I <br /> <br />3.5.3. ENGINEER's written interprelation or clarifi- <br />cation (pursuant to paragraph 9.4). <br /> <br />I <br /> <br />Reuse of Documents: <br /> <br />3.6. Neither CONTRACTOR nor any Subcontractor or <br />Supplier or other person or org~tnization performing or fur- <br />nishing any of the Work under a direct or indirect contract <br />with OWNER shall have or acquire-any title to or ownership <br />rights in any of the Drawings, Specifications or other docu- <br />ments (or copies of any thereot) prepared by or bearing the <br />seal of ENGINEER; and they shall not reuse any of them on <br />extensions of the Project or any other project without written <br />consent of OWNER and ENGINEER and specific written <br />verification or adaptation by ENGINEER. <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />ARTICLE 4-AVA1LABILlTY OF LANDS: PHYSICAL <br />CONDITIONS; REFERENCE POINTS <br /> <br />I <br /> <br />A ,ai/ability of Lands: <br /> <br />4. t. OWNER shall furnish, as indicated in the Contract <br />Documents, the lands upon which the Work is to he per- <br />formed, rights-of-way and easements for access thereto, and <br /> <br />I <br /> <br />I <br /> <br />such other lands which are designated for the use of CON. <br />TRACTOR. Easements for permanent structures or perma. <br />nent changes in existing facilities will be obtained and paid <br />for by OWNER. unless otherwise provided in the Contract <br />Documents. If CONTRACTOR believes that any delay in <br />OWNER's furnishing Ihe~e lands, rights.of-way" or ease- <br />ments entitles CONTRACTOR to an extension of the Con. <br />tract Time, CONTRACTOR may make a claim therefor as <br />provided in Article 12. CONTRACTOR shall provide for all <br />additional lands and access thereto that may be required for <br />temporary construction facilities or storage of materials and <br />equipment. <br /> <br />'- <br /> <br />Physical Conditions: <br /> <br />4.2.1. Explorativm" and Reports: Reference is made <br />to the Supplementary Conditions for identification of those <br />reports of explorations and tests of subsurface conditions <br />at the site that have been utilized by ENGINEER in prep- <br />aration of the Contract Documents. CONTRACTOR may <br />rely upon the accuracy of the technical data contained in <br />such reports, but not upon nontechnical data, interpreta. <br />tions or opinions contained therein or for the completeness <br />thereof for CONTRACTOR's purposes, Except as indi- <br />cated in the immediately preceding sentence and in para. <br />graph 4.2.6, CONTRACTOR shall have full responsibility <br />with respect to subsurface conditions at the site. <br /> <br />4.2.2. ExistinK Structures: Reference is made to the <br />Supplementary Conditions for identification of those <br />drawings of physical conditions in or relating to existing <br />surface and subsurface structures (except Underground <br />Facililies referred to in paragraph 4.3) which are at or <br />contiguous to lhe sile that have been utilized by ENGI. <br />N EER in preparation of the Contract Documents. CON- <br />TRACTOR may rely upon the accuracy of the technical <br />data contained in such drawings, but not for the complete. <br />ncss thereof for CONTRACTOR's purposes, Except as <br />indicated in the immediately preceding sentence and in <br />paragraph 4.2.6, CONTRACTOR shall have full respon- <br />sibility with respect to physical conditions in or relating <br />to such structures. <br /> <br />'--- <br /> <br />4.2.3. Report ofDiJJering Conditions: IfCONTRAC- <br />TOR believes that: <br /> <br />4.2.3. t. any technical data on which CONTRAC- <br />TOR is entitled to rely as provided in paragraphs 4.2,1 <br />and 4.2.2 is inaccurate, or <br /> <br />4.2.3.2. any physical condition uncovered or <br />revealed at the site differs materially from that indi- <br />cated, reflected or referred to in the Contract Docu- <br />ments, <br /> <br />CONTRACTOR shall, promptly after becoming aware <br />thereof and before performing any Work in connection <br />therewith (except in an emergency as permitted by para- <br />graph 6.22), notify OWN ER and ENGINEER in writing <br />about the inaccuracy or difference. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.