My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08723
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:23 PM
Creation date
10/5/2006 3:49:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Stream Name
Cache La Poudre
Basin
South Platte
Title
Specifications and Contract Documents for Reservoir Number 2 Rehabilitation Project
Date
7/1/1990
Prepared For
Larimer
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />thereon and all applicable field measurements. CONTRAC- <br />TOR shall promptly repon in writing to ENGINEER any <br />conflict, error or discrepancy which CONTRACTOR may <br />di\cover and shall obtain a written interpretation or c1arifi~ <br />cation from ENGINEER before proceeding with any Work <br />affected thereby; however, CONTRACTOR shall not be lia- <br />ble to OWNER or ENGINEER for failure to report any <br />conflict, error or discrepancy in the Contract Documents. <br />unless CONTRACTOR had actual knowledge thereof or should <br />reasonably have known thereof. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />2.6. Within ten days after the Effective Date of the Agree- <br />ment (unless otherwise specified in the General Rcquire~ <br />ments), CONTRACTOR shall sabmit to ENGINEER for <br />review: <br /> <br />I <br /> <br />I <br /> <br />2.6.1. an estimated progress schedule indicating the <br />starting and completion dates of the various stages of the <br />Work; <br /> <br />I <br /> <br />2.6.2. a preliminary schedule of Shop Drawing sub- <br />missions; and <br /> <br />I <br /> <br />2.6.3. a preliminary schedule of values for all of the <br />Work which will include quantities and prices of ih:ms <br />aggregating the Contract Price and will subdivide the Work <br />into component parts in sufficient detail 10 serve as the <br />basis for progress payments during construction. Such <br />prices will include an appropriate amount of overhead am.l <br />profit applicable to each item of Work which will be con- <br />firmed in writing by CONTRACTOR at the time of sub- <br />mission. <br /> <br />I <br /> <br />I <br /> <br />2.7, Before any Work at the site is staned, CONTRAC- <br />TOR shall deliver to OWNER, with a copy to ENGINEER, <br />certificates (and other evidence of insurance requested by <br />OWNER) which CONTRACTOR is required to purchase and <br />maintain in accordance with paragraphs 5.3 and 5.4, and <br />OWNER shall deliver to CONTRACTOR certificates (and <br />other evidence of insurance requested by CONTRACTOR) <br />which OWNER is required to purchase and main.tain in <br />accordance with paragraphs 5,6 and 5.7. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Preconstruction Conference: <br /> <br />2.8. Within twenty days after the Effective Date of the <br />Agreement, but before CONTRACTOR starts the Work at <br />the site, a conference attended by CONTRACTOR, ENGI- <br />NEER and others as appropriate wil.l be held to discuss the <br />schedules referred to in paragraph 2.6, to discuss procedures <br />for handling Shop Drawings and other submitta.ls and for <br />processing Applications for Payment, and to establish a working <br />understanding among the parties as ro the Work. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Finalizing Schedules: <br /> <br />2.9. At least tcn days before submission ufthe first Appli- <br />cation for Payment a conference attended hy CONTRAC- <br />TOR, ENGINEER and others as appropriate will be held to <br />finalize the schedu.les submitted in accordance with para- <br /> <br />I <br /> <br />I <br /> <br />graph 2.6. The finalized progress schedule will be acceptable <br />to ENGIN EER as providing an orderly progression of lhe <br />Work to completion within the Contract Time, but such <br />acceptance will neither impose on ENGINEER responsibility <br />for the progress or scheduling of the Work nor relieve CON- <br />TRACTOR from full responsibility therefor. The finalized <br />schedule of Shop Drawing submissions wi.ll be acceptable to <br />ENGlN EER as providing a workable arrangement for pro- <br />cessing the submissions. The finalized schedu.le of values will <br />be acceptable to ENGlN EER as to form and substance. <br /> <br />ARTICLE 3-CONTRACT DOCUMENTS: INTENT, <br />AMENDING. REUSE <br /> <br />Intent: <br /> <br />3..1. The Contract Documents comprise the entire agree- <br />ment between OWNER and CONTRACTOR concerning the <br />Work. The Contract Documents are complementary; what is <br />called for by one is as binding as if called for by all. The <br />Contract Documents will be construed in accordance with <br />the law of the place of the Project. <br /> <br />3.2. It is the intent orthe Contract Documents to describe <br />a functional.ly complete Project (or part thereoO to be con. <br />structed in accordance with the Contract Documents. Any <br />Work. materials or equipment that may reasonably be inferred <br />from the Contract Documents as being required to produce <br />the intended resolt will be supplied whetheror not specifically <br />called for. When words which have a well-known technical <br />or traue meaning are used to describe Work, materials or <br />equipment su,h words shall be interpreted in accordance with <br />that meaning. Referen"ce to standard specifications. manuals <br />or codes of any technical society. organization or association, <br />or to the Laws or Regulations of any governmental authority, <br />whether such reference be specific or by imp.lication. shall <br />mean the latest standard specification, manual, code or Laws <br />or Regulations in effect at the time of opening of Bids (or. on <br />the Effective Date of the Agreement if there were no Bids), <br />except as may be otherwise specifically stated. However. no <br />provision of any referenced standard specification, manual <br />orcode (whether or not specifica.lly incorporated by reference <br />in the Contract Documents) shall be effective to change the <br />duties and responsibilities of OWNER, CONTRACTOR or <br />ENGINEER, or any of their consultants, agents or employ- <br />ees from those set forth in the Contract Documents, nor shall <br />it be effective to assign to ENGINEER, or any of ENGI- <br />NEER's consultants, agents or employees, any duly or <br />authority to supervise or direct the furnishing or performance <br />of the Work or any duty or authority to undertake responsi- <br />bility contrary to the provisions of paragraph 9.15 or 9.16. <br />Clarifications and interpretations of the Contract Documents <br />shall be issued by ENGINEER as provided in paragraph 9.4. <br /> <br />3.3. If, doring the performance oflhe Work, CONTRAC- <br />TOR finds" conflict, error or discrepancy in the Contract <br />Docoments, CONTRACTOR shall so repon to ENGINEER <br />in writing at once and before proceeding with the Work affected <br />thereby shall obtain a written interpretation or clarification <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.