My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08721
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:22 PM
Creation date
10/5/2006 3:49:18 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Platte
Title
City of Sterling and Logan County Flood Hazard Mitigation Feasibility Study
Date
2/1/1998
Prepared For
Logan County
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Table 8. Unit Costs for Pawnee Creek Improvements <br /> <br />Item <br /> <br />Unit <br /> <br />Cost <br /> <br />Mobilization LS <br />Engineering LS <br />Legal! Administration LS <br />Property Acquisition (fee simple) AC <br />Property Acquisition (flow Easement) AC <br />Clearing & Grubbing AC <br />Remove & Replace Topsoil CY <br />Excavation & Fill for Levees CY <br />~p~ rn <br />Seeding for Revegetation AC <br />Structural Concrete CY <br />6" Full Depth Asphalt SY <br />Bridges SF <br />County Road Depression LF <br />Driveway Depression LF <br /> <br />5% of Construction Cost <br />12% of Construction Cost <br />5% of Construction Cost <br />$ 2,500 <br />$ 500 <br />$ 500 <br />$ 2 <br />$ 3 <br />$ 35 <br />$ 3,500 <br />$ 500 <br />$ 12 <br />$ 70 <br />$ 70 <br />$ 30 <br /> <br />These unit costs include both materials, installation, and repair of disturbed property. These costs are <br />based upon bid tabulations from similar projects along the front rlIDge. <br /> <br />A contingency of 15 percent of the construction cost was added to all estimates. This contingency is <br />intended to cover incidental costs that would be associated with these types of projects but are not <br />identified with the conceptual level of details. <br /> <br />Engineering will include design and construction surveying lIDd was assumed to be 12 percent of total <br />construction costs. <br /> <br />Legal, fiscal, and administration costs were assumed to be 5 percent of the total construction cost. In <br />the following tables are presented the estimated project cost for the Pawnee Creek Improvements <br />Alternative Nos. 2 through 6 respectively. Table 14 presents a summary of the costs for each <br />alternative. <br /> <br />111-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.