Laserfiche WebLink
<br />(8) Final review of Plan of Study by State and local <br />planners, engineers, and elected officials. <br /> <br />(9) l'repare Plan of Study. <br /> <br />i <br />~, <br />g: <br /> <br />Through th~s process, numerous information needs were <br />identified and llvaluated with respect to their relative illlportance <br />and priority. 'l)his evaluation resulted in the development of nine <br />major informatiqn needs which should be satisfied by the study. <br />These maJor infqrmation needs are listed below: <br /> <br />(1) . +nformation concerning changes in flood plain sizes <br /> <br />and flood depths along the Cache la Poud.re River and along major <br />.. <br />tributaries which IIlBY result from future changes in waterlihed land <br /> <br />use. <br /> <br />(2) lnformation about rainfall rates and flood stages which <br />would be useful in developing emergency evac~tion plans. <br /> <br />(3) +nformation about changes in the rainfall-runoff <br />relationships that my result from different t1Pes of .wallershed <br />land use changes. <br /> <br />(4) Information concerning the potential for determining <br />the effects of frrigation canals on flooding using Eaton Draw as <br />a case study. <br /> <br />{5} Information concerning the potential adverse effects <br />of gravel minin~ operations in the Cache la Poudre flood plain <br />between. Laporte and Greeley, and alternative methods- of preventing <br />adverse effects. <br /> <br />21 <br />