Laserfiche WebLink
<br />hereby rescind those said portions of Resolution Nos. 26, 65, <br />and 163, as listed in Table 2, approved and designated on the <br />dates shown in said Table 2; and <br /> <br />BE IT FURTHER RESOLVED that the Board does hereby designate <br />and approve as storm or floodwater runoff channels or basins <br />those areas delineated in Zone A in said Flood Insurance Study <br />for Unincorporated pitkin County, as listed in Table 4, <br />contingent upon the understanding that Pitkin County will <br />regulate the storm and floodwater runoff channels (Zone A) on a <br />case-by-case basis subject to a detailed hydrologic and <br />hydraulic analysis by a professional engineer; and <br /> <br />BE IT FURTHER RESOLVED that the Secretary of the Board is <br />directed to send a certified copy of this resolution to the City <br />of Aspen, the Town of Snowmass Village, and the Board of County <br />Commissioners of Pitkin County, the Colorado Division of <br />Disaster Emergency Services, and the Federal Emergency <br />Management Agency <br /> <br />Q ~ R ~ 1 E 1 Q a ~ ~ <br /> <br />I certify that the foregoing is a true and correct copy of a <br />resolution adopted by a majority, vote of the members of the <br />Colorado Water Conservation Board in regular session assembled <br />at lJenver, Colorad-o, on the 15t~d-ay of May, 1987, at which d <br />quorum was present. <br /> <br /> <br />-4- <br />