My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08463
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:39 PM
Creation date
10/5/2006 3:38:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Las Animas and Vicinity
Stream Name
Arkansas River
Basin
Arkansas
Title
Arkansas River and Tributaries, Las Animas, Colorado, and Vicinity
Date
2/18/1964
Prepared For
CWCB
Prepared By
COE
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />5 <br /> <br /> <br />. <br />.' <br /> <br />, <br /> <br />. <br /> <br />ENGBR <br />SUBJECT: <br /> <br />Arll:ansas River and Tributaries, Las Animas, Colorado, <br />and Vicinity <br /> <br />accordance with the vlan of the District Engineer and with such <br />modifications thereof as in the discret'ion of the Chief of Engineers <br />may be advisable: Provided that, prior to construct:i.on, local <br />interests furnish assurances satisfactory to the Secretary of the <br />Army that they will: <br /> <br />a. Provide, without cost to the United States, all lands, <br />easements, and rights-of-way necessary for construction of the <br />project, including easements required for flood-zoning purposes in <br />the ponding areas; <br /> <br />b. Hold and save the United States free from damages due <br />to the construction works; <br /> <br />c. At least ann~1l1 inform individuals concerned aQout <br />the residual flood problem involved owing to temporary ponding; <br /> <br />d. Prevent encroachnlent on the river channel, Which would <br />reduce the design flow capacity through the leveed section and on <br />the ponding areas and interior drains; and, if ponding area capacity <br />is impaired, prov:i.de substitute storage capacity or equivalent <br />pumping capacity promptly without cost to the United States; <br /> <br />e. Make any alterations to existing improvements, other <br />than railroad bridges and approaches in connection therewith, which <br />may be required because of the project; 'and <br /> <br />f. Maintain and operate the works after completion, <br />including the overbank clearing under and between the new highway <br />bridge and the existing railroad bridge, in accordance with regu- <br />lations vrescribedby the Secretary of the Army. <br /> <br />The Board further recommends that: <br /> <br />Construction begin concurrent with or subsequent to <br />replacement of the United States Highway No. 50 bridge <br />across the Arkansas River; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.