My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08428
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:32 PM
Creation date
10/5/2006 3:36:27 AM
Metadata
Fields
Template:
Floodplain Documents
County
Lincoln
Community
Limon
Stream Name
Limon area rivers and streams
Basin
Arkansas
Title
Town of Limon Reconnaissance Level Investigation
Date
9/3/1987
Prepared For
Limon
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ALTERNATIVE I-D <br />REINFORCED CONCRETE BOX CULVERTS <br />7 ft. X 7 ft. <br /> <br />Alternative I-D uses 12 - 7ft. x 7 ft. concrete box culverts <br />(see Figure 9) to bring the water surface elevation of the <br />100-ycar flood event into the tributaries natural challnel. <br />Alternative I-D incorpor'ates two railroad tracks in the <br />crossing. <br /> <br />",. <br />~- <br /> <br />'. <br /> <br /> <br />..' <br /> <br />.:::- <br /> <br />, <br /> <br />84 <br /> <br />FIGURE 9 <br /> <br />Cost Estimate <br /> <br />In researching the costs associated with Alternative I-D we <br />contacted Carder Concrete. Littleton. Colorado. Carder <br />Concrete estimated E-80-RR. railroad loading design. 7 ft. x 7 <br />ft. concrete box culverts delivered to jOb site at limon would <br />be $261.00 per linear foot. <br /> <br />To determine the labor involved in excavating. placing. and <br />backfilling the concrete culverts we contacted Binder <br />Construction. Denver. Colorado. Binder Construction stated <br />that they have experience in placing pipe of equal size and <br />usually bid such a jOb at about $ 125.00 per linear ft. <br /> <br />Materials: <br /> <br />Twelve rows of Box Culverts x 55 ft. length <br />12 x 55 ft. ~ 660 L.F. @ $261.00 ~ $ 172.260.00 <br /> <br />Labor: <br /> <br />660 L.F x $125.00 L.F. <br /> <br />~ $ 82.500.00 <br /> <br />Enqineerinq: <br /> <br />Engineering design. survey. and inspection @ 10%= $ 25.475.00 <br /> <br />Total Cost Estimate Alternative I-D <br /> <br />~ $280.235.00 <br /> <br />3820E <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.