Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />; <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ALTERNATIVE I-B <br />REINFORCED CONCRETE BOX CULVERTS <br />10 ft. x 7 ft. <br /> <br />Alternative l-B uses 8 - 10ft. x 7 ft. concrete box culverts <br />(see F'igure 7) to bring the water surface elevation of the <br />100-year flood event into the tributaries natural channel. <br />Alternative I-B incorporates two railroad tracks in the <br />crossing. <br /> <br /> <br />6() <br /> <br />--i /0'-1"'--' <br />./ <br /> <br />FIGURE 7 <br /> <br />Cost Estimate <br /> <br />In researching the costs associated with Alternative I-B we <br />contacted Carder Concrete. Littleton. Colorado. Carder Concrete <br />estimated E-80-RR. railroad loading design. 10 ft. x 7 ft. <br />concrete boxes delivered to jOb site at limon would be $ 488.00 <br />per linear foot. <br /> <br />To determine the labor involved in excavating. placing. and <br />backfilling the concrete culverts we contacted Binder <br />Construction. Denver. Colorado. Binder Construction stated <br />that they have experience in placing pipe of equal size and <br />usually bid such a jOb at about $ 150.00 per linear ft. <br /> <br />Materials: <br /> <br />Eight rows of Box Culverts x 55 ft. length <br />8 x 55 ft.= 440 L.F. @ $488.00 <br /> <br />= $ 214.720.00 <br /> <br />Labor: <br /> <br />440 L.F x $150.00 L.F.= $ 66.000.00 <br /> <br />Enqineerinq: <br /> <br />Engineering design. survey. and inspection @ 10'= $ 28.072.00 <br /> <br />Total Cost Estimate Alternative I-B <br /> <br />; $308.792.00 <br /> <br />3820E <br /> <br />-10- <br />