Laserfiche WebLink
<br />2 <br /> <br />The modifications are effective as of the date shown above. The map panel listed above and as modified <br />by this letter will be used for all flood insurance policies and renewals issued for your community. <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 150 feet upstream ofE-470 <br />Approximately 300 feet upstream ofE-470 <br /> <br />5,546 <br />5,547 <br /> <br />5,547 <br />5,548 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Pubiic notification of the proposed modified BFEs will be given in the Denver Post on or about <br />November 29 and December 6, 2000. A copy of this notification is enclosed. In addition, a notice of <br />changes will be published in the Federal Register. Within 90 days of the second publication in the <br />Denver Post, any interested party may request that FEMA reconsider the detennination made by this <br />LOMR. Any request for reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the detennination to modify the BFEs made by <br />this LOMR may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your community will serve as a repository for these new data. We encQurage you <br />to disseminate the infonnation reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />infonnation. We also encourage you to prepare a related article for publication in your community's <br />local newspaper. This article should describe the assistance that officials of your community will give to <br />interested persons by providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel and <br />FIS report warrant physical revision and republication in the future, we will incorporate the <br />modifications made by this LOMR at that time. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, <br />the floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable <br />to your community and adopted by appropriate community action, as specified in Paragraph 60.3( d) of <br />the NFIP regulations. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP . Your <br />community is responsible for approving all floodplain development and for ensuring all necessary <br />penn its required by Federal or State law have been received. State, county, and community officials, <br />based on knowledge of local conditions and in the interest of safety, may set higher standards for <br />construction in the SFHA. If the State, county, or community has adopted more restrictive or <br />comprehensive floodplain management criteria, these criteria take precedence over the minimum NFIP <br />criteria. <br />