Laserfiche WebLink
<br />I <br />I <br />I TABLE V-4 (continued) <br /> COST BREAKDOWN SUMMARY-BY REACH <br />I Construction Costs <br />I Total Right-of Present Total <br /> Design Channel Street Utili ty Sub Contingency Construction Way Annual Worth Improvement <br /> Reach Description Frequency Improvements Improvements Relocation Totals 25% Costs Acquisition O&M O&M Costs <br />I A1C Westminster <br />I Enlarge existi~ <br /> detention pond <br /> and install under- <br /> ground 54" RCP 213,000 154,000 36,300 403,300 100,800 504,100 1,700 5,800 84,000 589,800 <br />I AID Unpgrade under- <br /> ground storm sewer <br />I and construct new <br /> detention pond east <br /> of Lowell 10 & 100 119,200 230,700 13,400 363,300 90,800 454,100 23,400 8,400 121,700 599,200 <br />I Trib Arvada <br />B Enlarge concrete <br /> channel outfall <br />I from Lake Arbor & <br /> construct grass-lined <br /> channel inlet 100 167,700 24,400 6,900 199,000 49,800 248,800 58,000 2,400 34,800 341,600 <br />I Trib Improve culvert <br />C beneath Wads- <br /> worth 100 29,400 130,200 4,300 163,900 41,000 204,900 -0- 600 8,700 213,600 <br />I 4 Arvada <br /> Existing Condition -0- -0- -0- -0- -0- -0- -0- 2,650 38,400 38,400 <br />I 5 Arvada <br /> Existing Condition: <br /> Construct flow <br />I separation structures <br /> at Church Ditch <br /> & Farmer's Highline <br />I Canal 30,600 -0- -0- 30,600 7,600 38,200 -0- 4,150 60,100 98,300 <br /> Jefferson County <br />I Existing Condition -0- -0- -0- -0- -0- -0- -0- 970 14,100 14,100 <br />I <br /> V - 7 <br />I <br />