Laserfiche WebLink
<br />I <br />I <br />I TABLE V-4 <br />I COST BREAKDOWN SUMMARY-BY REACH <br /> Construction Costs <br />I Total Right-of Present Total <br /> Design Channel Street Utility Sub Contingency Construction Way Annual Worth Improvement <br /> Reach Description Frequency Improvements Improvements Relocation Totals 25% Costs Acquisition O&M O&M Costs <br />I <br /> 1 Adams County <br />I Construct concrete <br /> and grass lined <br /> channels, improve all <br />I crossings 25 970,500 289,200 86,600 1,346,300 336,600 1,682,900 418,700 12,300 178,100 2,279,700 <br />2A Construct con- <br /> tinuous grass-lined <br />I channel & improve <br /> all crossings 25 368,000 481,200 105,200 954,400 238,600 1,193,000 215,600 7,600 110,100 1,518,700 <br />I 2B Westminster <br /> Construct con- <br /> tinuous grass-lined <br />I channel & improve <br /> all crossings 10 356,200 121,000 114,100 591,300 147,800 739,100 107,400 7,000 101,400 947,900 <br /> 3 Construct struc- <br />I tural walled, and/or <br /> grass lined channels, <br /> improve all <br />I crossings 100 & 10 631,800 385,200 97,800 1,114,800 278,700 1,393,500 138,600 7,920 114,700 1,646,800 <br />AlA Construct Maintenance <br /> trail from 76th to <br />I 80th, concrete and <br /> grass lined channels, <br /> improve all <br />I crossings 100 549,100 204,600 27,000 780,700 195,200 975,900 17,700 4,390 63,600 1,057,200 <br /> A1B Improve culvert <br />I at 80th, con- <br /> struct concrete and <br /> grass lined <br /> channels 100 156,800 174,600 30,000 361,400 90,400 451,800 29,000 2,400 34,800 515,600 <br />I <br />I <br />I If - 6 <br />