My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08366
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:33:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Contacts and Meetings
Date
4/21/1972
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />01/04/2000 18:00 <br /> <br />" <br /> <br />4. <br /> <br />5, <br /> <br />6, <br /> <br />402-221-4890 <br /> <br />CORPS OF ENGINEERS <br /> <br />PAGE 04/05 <br /> <br />DRAFT <br />3 <br /> <br />Were the techniques employed in the Study consistent with principles and practices <br /> <br />adopted by the WMO for such studies as detailed in the Man/la/ for Estimation of <br /> <br />Prohah~e Maximum Precipitation, Second Edition, (WMO 332) Geneva. <br /> <br />Switzerland, 1986? <br /> <br />Were calculations performed accurately? <br /> <br />Based on current meteorological understanding, was'the method used to specilY <br /> <br />the influence of topography on a PMP storm acceptable? Were more accurate or <br /> <br />dependable techniques available to specify the influence of topography on a PMP <br />storm over the Cherry Creek Watershed? <br /> <br />7, <br /> <br />Was it reasonable to center the non-orographic PMP storm precipitation in such a <br /> <br />way as to maximize the volume of precipitation falling within the Cherry Creek <br />Watershed? <br /> <br />8, Were any steps omitted or overlooked in the methodology used to develop the, <br /> <br />Study's site-specific estimates of PMP for the Cherry Creek Watershed? <br />
The URL can be used to link to this page
Your browser does not support the video tag.