My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08304
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:12 PM
Creation date
10/5/2006 3:31:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Federal Emergency Management Agency
Date
5/1/1998
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Federal Emergency Management Agency <br /> <br />with State or 10Clll floodplain management <br />laws or ordinances even if the structure had <br />received & variance before the present loss <br />from the applicable floodplain management <br />requirements. <br />Conditions <br />(l) When a structure covered under Cov- <br />erage A-Building Property-sustalns a loss <br />caused by a "flood'- as defined by this policy. <br />our Jl&yment for the loss under this Coverage <br />D will be for the increased cost to elevate. <br />floodproof. relocate. demolish. or any com- <br />bination thereof. caused by enforcement or <br />current State or local floodplain manage- <br />ment ordinances or laws. OUr Jl&yment for el- <br />igible demolition activities will be for the <br />cost to demolish and clear the site of the <br />building or a portion thereof caused by en- <br />forcement of current State or loca.l nood- <br />plain management ordinances or laws. Eligi- <br />ble activities for the cost of clearing the site <br />will include those necessary to discontinue <br />utility service to the site and ensure proper <br />a.bandonment of on-site utilities. <br />(2) When the building is repaired or rebuilt. <br />it must be intended for the same occupancy <br />as the present building unless otherwise re- <br />Quired by current floodplain management or- <br />dinances or laws. <br />Ezclusions <br />Under this CoveTage D (Increased Cost of <br />Compliance). we lDill not pay fOT: <br />(1) The cost associated with enforcement of <br />any floodplain management ordinance or law <br />in communities participating in the Emer- <br />gency Program. <br />(2) The cost associated with enforcement of <br />any ordinance or law that requires any in- <br />sured or others to test for. monitor. clean uP. <br />remove. contain. treat. detoxify or neutral- <br />ize. or in any way respond to. or assess the <br />effects of pollutants. Pollutants include but <br />are not limited to any solid. liquid. gaseous <br />or thermal irritant or cont.sam;nAnt. includ. <br />ing smoke. vapor. soot. fumes. acid. alkalis. <br />chemicais and waste. Waste includes but is <br />not limited to materials to be recycled. re- <br />conditioned or recla.i1ned. <br />(3) The loss in value to any covered build- <br />ing or other structure due to the require- <br />ments of any ordinance or law. <br />(4) The loss in residual value of the <br />undamaged portion of a building demolished <br />as a consequence of enforcement of any <br />State or local noodplain management law or <br />ordinance. <br />(5) Any increased cost of compliance under <br />this Coverage D: <br />(a) Until the covered building is actually <br />elevated. floodproofed. demolished or relo- <br />cated on the same or to another premises; <br />and <br />(b) Unless the covered building is elevated. <br />fioodproofed. demolished. or relocated as <br />soon as reasonably possible after the loss. <br />not to exceed two years. <br /> <br />pt. 61, App. A(2) <br /> <br />(6) For any code upgrade requirements. <br />e.g.. plumbing or electrical Wiring. not spe- <br />cifically related to the State or local flood- <br />plain management law or ordin..nce. <br />('7) For any compliance actiVit,ies needed to <br />bring additions or Improvemenl;s made after <br />the loss occurred into complian"e with State <br />or local floodplain management laws or ordi- <br />nances. <br />(8) Loss due to any ordinancll or law that <br />you were required to comply w',th before the <br />current loss. <br />(9) For any rebuilding activity to stand- <br />ards that do not meet the NFIP's minimum <br />requirements. This includes ,cny situation <br />where the insured has receh'ed from the <br />State or community a varianl:e in connec- <br />tion with the current flood loss to rebuild <br />the property to an elevation below the base <br />flood elevation. <br />(10) For any structure insured under a <br />Group Flood Insurance Policy issued pursu- <br />ant to 44 CFR 61.17. <br />Other FTovisions <br />(1) Increased Cost of Compliance coverage <br />will not be included in the calculation to de- <br />termine whether coverage meets the 80% in- <br />surance-to-value requirement for payment <br />under Article 3.B.3 for loss from land subsid- <br />ence. sewer backup. or seepage of water. <br />(2) All other conditions and provisions of <br />the policy apply. <br /> <br />Article 5-Special Provisions 'lpplicable to <br />Coverages A, B. and C <br /> <br />A. This policy is not a valued policy. Loss <br />will be paid. provided the m..ured has pur- <br />Chased a sufficient amount of coverage. i.e.. <br />in an amount equal to the lesser of the value <br />of the da.m&ged property under the terms and <br />conditions Of this policy (and regardless of <br />whether the amount of insurance purchased <br />is greater than such value) or the limit of <br />coverage permitted under the ,tct. <br />B. InsuTed FTOPeTtY. Covered Locations. The <br />building and personal property are covered <br />while the property is located: ... <br />1. At the property address shown on the ap- <br />plication; and <br />2. For 45 days at anothe:r place above <br />ground level or outside of the special hazaTd <br />area. to which any of the insured property <br />shall necessarily be removed in order to pro- <br />tect and preserve it from flood. due to the <br />imminent danger of flood (Provided. personal <br />property so removed must t.. placed in a <br />fully enclosed building or otll,erwise reason- <br />ably protected from the elenlents to be in- <br />sured against loss). in which case the reason- <br />able expenses incurred by the Insured. in- <br />cluding the value of its own labor at prevail- <br />ing Federal minimum wage ",.tes. in moving <br />any of the insurad propert,y temporarily <br />away from the peril of flood shall be reim- <br />bursed in an amount not to exceed S5OO.oo. <br />This policy's deductible amowlts. as provided <br />for at Article 7, shall not be applied to this <br /> <br />, <br /> <br />Z77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.