My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08290
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:10 PM
Creation date
10/5/2006 3:31:19 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
South Platte
Basin
South Platte
Title
Contract Documents and Specifications Eastern Flow Path Drainageway Improvements, Milliken
Date
12/1/1983
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />11.2 <br /> <br />o. Time For Completion: Timely completion of thH work is aI'" important con- <br />sideration of the Contract. The work shall be completed within ~ con- <br />secutive calendar days fol1owinq the Notice to Proceed. ,~p <br /> <br />7. SUbmission Of Bid: Bids must bE:! sealed and deposited wit~h the Town of <br />Milliken at its office prior to the adv€}::,tised time for receipt of bids. <br />The envelope must show the work "Bid", t,he project name "Eastern Flow <br />Path Drainageway Improvementsl1 and the Bidder's name. A Bidder may <br />withdraw his bid prior to the opening ti.me, bu.t not after the advertised <br />time. <br /> <br />8. Acceptance Of Bid: Promptly aft.er openi.ng the Bids, the ']~own of Milliken <br />will compile the Bid totals, The Contract will be awarded within thirty <br />days after opening. The Town of Milliken reserveB the r.i.9ht to confine <br />consideration of the Bids to thE~ base bid total. The 11o~Nn of Milliken <br />reserves the right to reject any or all Bids, "to waive any informality, <br />and to award the Contract based upon t:h€~ lowest or best bid which serves <br />the Town of Milliken's interest.. <br /> <br />9. Requirements For Successful Bidder: <br /> <br />a. The successful Bidder must E~xecute t.he Agreement included within ten <br />days of the Notice of Award" <br /> <br />b. The successful Bidder will furnish ai: his expense fully executed <br />copies of a Contractor's PerformaIlcE~ and Payment Bonds in the amount <br />of the Contract Price within ten days of the Notice of Award. <br /> <br />c. The successful Bidder will furnish t:he requisite Cert:.Lficates of <br />Insurance within ten days of the Not~:Lce of Award. <br /> <br />10. Colorado Water Conservation Board: The Colorado \'later Conservation Board <br />serves as technical representative of the Town. ~rhe Colorado Water <br />Conservation Board requires approval by its staff of all contracts, <br />payments, and all change orders. <br /> <br />11. Nondiscrimination In Employment ~ Work under this Contrac-t: will obligate <br />the Contractor to not discriminate in any employment prac-t:ices. <br /> <br />12. Right-Of-Way: The OWner's right-of-way is shown on the Drawings. The <br />Contractor and his employees shall take care to confine "their operations <br />to within the indicated right-of-way. <br /> <br />13. Minimum Wage Rates: The minimum hourly rates of '\vages required to be <br />paid to the various laborers and mechani.cs employed by contractors and <br />subcontractors on the construction work (l!mbraced by the Contract shall be <br />in accordance with the schedule contained in the Wage Det:errnination <br />Decision No. CQ-B3-S109 of the Secretary of Labor attached hereto, these <br />rates having been determined by the Secretary of Labor pursuant to <br />Section 12 of the Federal Aid Highway Ac1: of 1968 to tho"" prevailing on <br />the same type of work on simila:r construction in the immediate locality <br />in accordance with the Act of August 30, 1935, known as the Davis-Bacon <br />Act (40 U, S,C., Sec, 276-a). Wage guidelines may be found in Part III. <br />
The URL can be used to link to this page
Your browser does not support the video tag.