Laserfiche WebLink
<br />.,.! <br />,'f. <br /> <br /> TABLE 18 (Contd.) FRANKLIN STREET DRAINAGE <br /> j <br />Item Description Quantity Unit Total <br /> Cost Cost <br /> Service Area No.8 Cant. <br />Fran!:lin St. (South) <br />1 33" RCP 1,450 LF S33fU' $ 47,850.00 <br /> Dewatering S12/L!' 17 ,400.00 <br /> Asphalt Replacement $13fL!' 18,850.00 <br /> Manholes $ 4fLF 5,800.00 <br />2 42" RCP 1,200 LF $42/LF 50.400,00 <br /> Dewatering 512fLF 14,400.00. <br /> Asphalt Replacement 513fLF 15,500.00 <br /> Manholes $ 4/LF 4,800.00 <br />Franklin St. (North) <br />1 24" RCP 1 ,250 LF $24fLF 30,000.00 <br /> Oewatering $12lLf 15,000.00 <br /> Asphalt Replacement 513/LF 16.250.00 <br /> Manholes $ 4/LF 5,00.00 <br />2 42" RCP 1 1,500 LF $42/LF 63.000.00 <br /> Dewa tering 512/LF 18,000.00 <br /> Asphalt Replacement $13/LF 19,500.00 <br /> Mannoles $ 4/lF 6,000.00 <br />Elm St. <br />1 24" RCP 1.500 LF S24/LF 36,000.00 <br /> Dewatering 512/LF '18,000.00 <br /> Asphalt Replacement $13/LF 19,500.00 <br /> Manholes $ 4/LF 5,000.00 <br />Pawnee Avenue <br />1 36" RCP 1,750 LF 536fLF 63,000.00 <br /> Dewatering $12/LF 21,000.00 <br /> Asphalt Replacement $13fLF 22.750.00 <br /> Manholes $ 4fLF 7,000.00 <br /> Total Construction Cost $1,003,000.00 <br /> Engineering and Contingencies 200,600.00 <br /> Legal, Fiscal, and Administration 60,180.00 <br /> TOTAL COST 51,263,780.00 <br /> I <br /> <br />113 <br />