Laserfiche WebLink
<br />except rock excavation, to the extent directed by thE' Engineer; disposal of <br />excess excavated materials in an approved location; replacement with suitable <br />backfill material to provide a suitable foundation, including compaction, and <br />any related and necessary materials, work and equipment required to accomplish <br />the overexcavation and replacement of granular material as required. <br /> <br />Item Nos. 1001 and 1002 FURNISH AND INSTAll. SELECT AND CLASSIFIED <br />BACKFILL MATERIAL. The measurementTOrp~ymentCiTl:his time shall be the <br />total number of cubic yards in place of backfill material required to complete <br />the work. <br /> <br />The unit price per cubic yard shall be the complete cost of the <br />Contractor to furnish and install backfill material. The price shall include: <br />excavation, haul, placement and compaction of the backfill material, and any <br />related and necessary material, work and equipment requirE!d to accomplish the <br />placement of backfill material. <br /> <br />Item No. 1003 SURVEY AND STAKING. No quantity measurement will be made <br />for any materials or work required to compl,"te this item. The lump sum price <br />bid for this item shall include all of the Contractor's costs of whatsoever to <br />perform construction survey and stakin(l. The price bid shall include initial <br />construction staking and surveying monuments sufficient to construct this pro- <br />ject with adequate offsets and any other staking or re-stakin(l required. <br /> <br />1-17 <br />